![HydroTherm HeatNet KN-20 Field Assembly Instructions Download Page 25](http://html1.mh-extra.com/html/hydrotherm/heatnet-kn-20/heatnet-kn-20_field-assembly-instructions_2192567025.webp)
25
P/N 42-9551
KN Series Gas-fired direct vent cast iron boilers – Field assembly instructions
Step 70
Route plastic sense line
through jacket rear
1. Disconnect the rear conduit junction
box before proceeding.
2. Guide the plastic sense line through
the grommeted hole in the jacket rear
panel.
3. Re-attach the rear conduit junction
box.
Step 71
Apply left side jacket
insulation
Use of an approved dust
respirator is strongly recom-
mended when handling the
insulating components of the
boiler.
1. Press the left side insulation into
place.
2. Make sure to position the insulation
UNDER the conduits and the plastic
sense line.
Step 72
Install jacket left side
panel
Leather gloves are recom-
mended when handling sheet
metal components. They will
reduce the possibility of cuts
from sheet metal edges.
1. Install and secure the jacket left side
panel using the screws provided.
Step 73
Install top jacket panel
strips
Leather gloves are recom-
mended when handling sheet
metal components. They will
reduce the possibility of cuts
from sheet metal edges.
1. Install a jacket top panel strip on each
side of the jacket top.