![HydroTherm HeatNet KN-20 Field Assembly Instructions Download Page 2](http://html1.mh-extra.com/html/hydrotherm/heatnet-kn-20/heatnet-kn-20_field-assembly-instructions_2192567002.webp)
2
P/N 42-9551
KN Series Gas-fired direct vent cast iron boilers – Field assembly instructions
Hazard icons
You will find the following icons
throughout this manual.
(English/French)
The
WARNING
icon indicates
a hazard that can cause
severe
personal injury, death or
substantial property damage
.
The
CAUTION
icon indicates a
hazard that will or can cause
minor
personal or property damage
.
The
NOTICE
icon calls out special
instructions that are important, but
are not related to hazards.
Other manuals
You must read and follow this
manual, the
KN Series Gas Boiler
Installation and Operating
Instructions
, the
KN HeatNet
Control manual
and all additional
materials supplied with the boiler.
Failure to do so can result in severe
personal injury, death or substantial
property damage.
Boiler/control installa-
tion and setup
After completing assembly of the
KN boiler, follow all instructions
in the Installation and Operation
Instructions and Control Manual for
installation, start-up and testing.
Contents and information
Read before beginning the installation 5
Boiler ratings and specifications 6
Installation site preparation 7
Prepare the boiler 10
Water piping 11
Gas piping 18
Wiring a single boiler 20
Control setup 25
Vent piping (and air piping when used) 28
Condensate drain line 29
Fill and test the system 30
Starting the boiler 32
Annual start-up 41
Maintenance 42
Replacement parts 46
Appendix A — suggested wiring 48