![HydroTherm HeatNet KN-20 Field Assembly Instructions Download Page 16](http://html1.mh-extra.com/html/hydrotherm/heatnet-kn-20/heatnet-kn-20_field-assembly-instructions_2192567016.webp)
16
P/N 42-9551
KN Series Gas-fired direct vent cast iron boilers – Field assembly instructions
Step 40
Apply jacket front insula-
tion
Leather gloves are recom-
mended when handling sheet
metal components. They will
reduce the possibility of cuts
from sheet metal edges.
1. Press jacket front insulation against
the back of the front panel.
Step 41
Mounting hole alignment
1. The installer is pointing to the jacket
panel mounting hole toward the left
center of the jacket front panel.
2. Insert a screwdriver through this hole
and the insulation to help align the
hole to the mounting boss on the
front section while placing the jacket
front panel.
3. Position the jacket front panel on
the section and secure with a bolt
through this hole.
Step 42
Install gas line bracket
1. Install the gas line bracket to the right
front using the bolts provided.