![HydroTherm HeatNet KN-20 Field Assembly Instructions Download Page 17](http://html1.mh-extra.com/html/hydrotherm/heatnet-kn-20/heatnet-kn-20_field-assembly-instructions_2192567017.webp)
17
P/N 42-9551
KN Series Gas-fired direct vent cast iron boilers – Field assembly instructions
Step 43
Apply jacket rear insula-
tion
Use of an approved dust
respirator is strongly recom-
mended when handling the
insulating components of the
boiler.
1. Press jacket rear insulation against the
back of the rear panel.
Step 44
Install jacket rear panel
The jacket rear panel is sup-
plied with the igniter and
conduit box installed.
Leather gloves are recom-
mended when handling sheet
metal components. They will
reduce the possibility of cuts
from sheet metal edges.
1. Insert a screwdriver through the left
center jacket mounting hole.
2. Use the screwdriver to help align the
mounting hole with the mounting
boss on the rear section.
3. Secure the jacket rear with the bolts
provided.
4. Apply the upper left bolt and the two
lower bolts.
5. The fourth jacket mounting hole is
under the conduit box. Temporarily
remove this box to install the bolt.
Then re-install the box.