Page 8
Hydro Systems Europe 2018
5.4.5.
Take chemical container lid and drill 20mm (¾’’) hole for PVC Hose to pass through, ensure tube is not a tight fit (to
avoid vacuum).
Note:
Do not drill lid when screwed onto chemical container to avoid swarf.
5.4.6.
Replace lid on container, and place the inlet tube into the container.
5.5.
Installation Step 5: Trigger Connections
5.5.1.
The EvoClean uses the following trigger signal inputs.
5.4.1.
Eductors run from left to right in the following order:
In 4 Product units (Single cabinet)
•
F (Flush) 1, 2, 3, 4
In 6 product units (Single cabinet)
•
F (Flush) 1, 2, 3, 4, 5, 6
In 8 Product units (Twin cabinet)
•
F (Flush) 1, 2, 3, 4, 5, 6, 7, 8.
Note:
Flush - Do not connect any tube to this position.
5.4.2.
Measure the distance from the Eductor to the base of the chemical container.
5.4.3.
Cut the 12.7mm (½’’) or 13mm ID Flexible PVC Hose tube to length.
Note:
Alternative hose options are available. Contact Hydro Systems for further information.
5.4.4.
Push the PVC hose on to the detached check valve and secure with cable tie, then push the elbow into the eductor
and secure with the clip, as shown in the diagram on the next page.