background image

AccuDose

 

Parts Diagram/List:

16 LPM Eductor (right side)

16* 10080730 Hose hook, dark grey (standard)

10080731 Hose hook, sky blue
10080732 Hose hook, red
10080733 Hose hook, green
10080734 Hose hook, light grey
10080735 Hose hook, yellow
* Hose hooks are for 16 LPM discharge tubes

17

10061100 Support

18

10080920 Selector valve replacement kit:

e. Suction stub, f. O-ring, g. selector
valve assembly

19

690014

Metering tip (kit)

20

500870

Tubing, 6mm x 2.1 m

21

509900

Weight

22

10076301 Foot valve -- Viton (EPDM also

available. Order 10076302.)

NOT SHOWN:

641750

Security screws (for cabinet sides)

Description

Part No.

Key

9

10

11

12

13

14a

18

19

17

19

e

15a

22

21

20

15b

14b

14c

19

20

21

22

16

f

g

a

d

b

c

Summary of Contents for AccuDose 3876GB-2

Page 1: ...VE STRAINERSPERIODICALLYFORCLOGGING CLEANIFNECESSARY 6 A short discharge tube is used with the 4 LPM eductor selector valve minimum tube length is 20 cm for correct operation A longer tube 1 2m is used with the 16 LPM eductor Slide end of tube with flooding ring over eductor discharge outlet The hose hook supplied may be installed on the long tube to allow it to conveniently hang from dispenser wh...

Page 2: ... concentrate X 1 If the test does not yield the desired ratio choose a different tip and repeat the test Alternative methods to this test are 1 pH using litmus paper and 2 titration Contact your concentrate supplier for further information on these alternative methods and the materials required to perform them AccuDose Parts Diagram 5 7 8 4 2 3 1 6 1 238100 Strainer washer 2 10082835 Swivel collar...

Page 3: ...are for 16 LPM discharge tubes 17 10061100 Support 18 10080920 Selector valve replacement kit e Suction stub f O ring g selector valve assembly 19 690014 Metering tip kit 20 500870 Tubing 6mm x 2 1 m 21 509900 Weight 22 10076301 Foot valve Viton EPDM also available Order 10076302 NOT SHOWN 641750 Security screws for cabinet sides Description Part No Key 9 10 11 12 13 14a 18 19 17 19 e 15a 22 21 20...

Page 4: ...water running required to operate unit properly d Discharge tube s not in place d Push tube firmly onto eductor discharge or flooding ring missing from hose barb be sure inner discharge tube inner discharge tube is installed and has flooding ring e Concentrate container empty e Replace with full container f Inlet hose barb not screwed f Tighten but do not overtighten into eductor tightly g Clogged...

Reviews: