![Hydro Mobile M2 Series Owner'S Manual Download Page 101](http://html.mh-extra.com/html/hydro-mobile/m2-series/m2-series_owners-manual_2191869101.webp)
100
fi g. 7.41
fi g. 7.42
7 - A
CCESSORIES
Cantilever Outrigger Supports
In a cantilever installation, it is possible to install cantilever outrigger supports at the ends of
the cantilever bridges on both sides of the mast to complete the installation of planking on
bottom outriggers along the entire length of the setup, if necessary. The
maximum width
of planking allowed on bottom outriggers is
four planks
.
Installation
1-
Align and insert the top tube of the cantilever outrigger support into the end tube of
the bridge. Push in the support as far as possible.
2-
Lift up the U-bracket and hold it up against the end tube of the bridge, making sure
the holes align properly. Secure the U-bracket in place by sliding a clevis pin through
the holes and locking it with a hitch pin clip.
3-
Insert a 72" (183 cm) outrigger in the bottom tube of the cantilever outrigger support
and tighten the tube bolt slightly.
4-
Once the planking is installed (maximum four planks wide), install a plank stop pin
in the outrigger on the cantilever support. Push the outrigger in until it is snug against
the planking and tighten the tube bolt properly to secure the outrigger in place.
(optional)
Outrigger
Cantilever
outrigger support
End tube of bridge
Sliding Doors
Two sliding doors allow the safe loading and unloading of materials and equipment onto
M2 Series motorized units.
Installation
1-
Retrieve the sliding doors and the door support guardrails from their storage location
on the motorized unit (fi g. 7.42).
Storage location
Sliding
door (yellow)
Note: Items depicted in illustrations may differ from actual products.
Door support
guardrail