.2
FOUNDATION, LEVELLING AND ANCHORING
Machine location should be carefully selected. A flat concrete floor area should be chosen. It should have enough free
space surrounding the machine to enable free access for safe operation and maintenance. The machine should be lev-
eled in both directions (from side to side & from front to back), using a level on the machine out-feed table. Six leveling
screws used for securing machine to the pallet during transport, should be installed, one in each corner of the machine
base, as shown below. It might be required to place steel plates under leveling bolts to prevent their sinking into the
concrete floor. In cases when the machine is to be anchored permanently, anchoring holes are provided. They are located
next to the leveling screw holes. The larger diameter hole is used for retaining during shipping and for use with concrete
floor anchors. The smaller diameter threaded hole at each corner, are used for leveling the saw.
Using a level on the machine out-feed table, level machine front to back and side to side.
NOTE:
In some cases leveling the saw infeed with a slight slope towards the blade is recommended. This will prevent
coolant from running down the raw stock. (This is especially true when cutting tubing or bundles).
WIRING CONNECTIONS
After the machine is leveled and anchored the necessary power hook-up needs to be performed.
Check that there is no sign of shipping damage to the electrical conduits, cords or hydraulic hoses.
As supplied, the S20 Series III is built to run on three phase AC Voltage, as indicated on the machine serial plate and volt-
age label. Machine voltage is customer specific and should be indicated while ordering the machine. If machine voltage
does not match available power source contact factory.
Power connection to the machine is made in the junction box, located at the side of the machine. The power cable can be
routed through the supplied hole in the junction box, and connections made to L, L2, L3, and ground terminals. Proper
strain relief should be used on the incoming power cable.
240V & 480V Junction Box
208V & 600V Junction Box
Summary of Contents for S20 SERIES III
Page 2: ......
Page 16: ......
Page 24: ......
Page 36: ......
Page 38: ......
Page 39: ...5 1 FOR HYDRAULIC SCHEMATICS AND PLUMBING DIAGRAMS SEE PDF ON ATTACHED CD SECTION 5 HYDRAULIC ...
Page 40: ......
Page 41: ...6 1 FOR MECHANICAL ASSEMBLY DRAWINGS SEE PDF ON ATTACHED CD SECTION 6 MECHANICAL ASSEMBLIES ...
Page 42: ......
Page 43: ...7 1 FOR OPTIONAL ASSEMBLY DRAWINGS SEE PDF ON ATTACHED CD SECTION 7 OPTIONS ...
Page 44: ......
Page 46: ...8 2 S20 Series III Layout ...
Page 47: ...8 3 S20 Series III Foot Print ...
Page 48: ......
Page 50: ......