.
SECTION 1 INSTALLATION
Upon delivery of your new S20 Series III saw, it is imperative that a thorough inspection be undertaken to check for any
damage that could have been sustained during shipping. Special attention should be paid to the electrical and hydraulic
systems to check for damaged cords and hoses, or for fluid leaks. In the event of damage caused during shipping, contact
your carrier to file for a damage claim.
LIFTING MACHINE
This machine is to be lifted in one, fully assembled piece. In order to lift the machine it needs to be in the following
condition:
•
Saw head in the down position
•
Coolant tank emptied
The S20 Series III may be lifted from the FRONT with a forklift, which has a minimum capacity of 4500 lbs (2040 kg) and a
fork length of 72” (830mm).
The S20 Series III is shrink-wrapped for shipping from our plant. Remove wrapping from the saw and dispose safely.
Complete the inspection for signs of damage. Undo the bolts that hold the saw to the pallet. Retain these bolts to use for
machine leveling.
Summary of Contents for S20 SERIES III
Page 2: ......
Page 16: ......
Page 24: ......
Page 36: ......
Page 38: ......
Page 39: ...5 1 FOR HYDRAULIC SCHEMATICS AND PLUMBING DIAGRAMS SEE PDF ON ATTACHED CD SECTION 5 HYDRAULIC ...
Page 40: ......
Page 41: ...6 1 FOR MECHANICAL ASSEMBLY DRAWINGS SEE PDF ON ATTACHED CD SECTION 6 MECHANICAL ASSEMBLIES ...
Page 42: ......
Page 43: ...7 1 FOR OPTIONAL ASSEMBLY DRAWINGS SEE PDF ON ATTACHED CD SECTION 7 OPTIONS ...
Page 44: ......
Page 46: ...8 2 S20 Series III Layout ...
Page 47: ...8 3 S20 Series III Foot Print ...
Page 48: ......
Page 50: ......