COMPONENT INSTALLATION
MI35.2020
21JUN95
Check list
1. Check all bolts and brackets for tightness.
2. Check that all hoses are securely clamped or tie wrapped.
3. Check that all wires are securely clamped or tie wrapped.
4. Check oil level before operating the system.
5. Check Hydraulic circuit:
a. Hoses are connected to corresponding valves
and jacks.
b. All fittings for tightness.
6. Check Wiring circuits:
a. That color coded wires are hooked properly.
b. All cables are securely fastened.
c. All ground wires are securely fastened to the
ground stud.
PART III