JOINING INSTRUCTIONS
Sectional construction means that two or more
merchandisers may be joined in line yielding one
long continuous display requiring only one pair
of ends.
A
LL JOINTS MUST BE AIR
-
TIGHT TO PREVENT
FORMATION OF ICE OR CONDENSATION
.
Prep Case
1. Check to be sure that merchandisers are
level and that the factory-installed nut retain-
ers and alignment pins are in place. Locate
Joining Kit and check contents against parts
list.
2. Remove shelves (if installed), display racks,
pans, front shelf supports and front air
grilles from the right end.
3. Remove the rear panel(s) from the right end.
On multi-deck cases remove the lower back
panel first. To remove a panel lift it up from
its bottom edge and out. No tools are
required.
Apply Silicone Gasket Pad
1. Apply a
continuous bead
of silicone
around the front
joining hole.
2. Remove paper
backing from
gasket pad and
position the pad
as shown.
3. Apply another
continuous bead
of silicone on
the gasket pad.
4. Apply foam
gaskets as
shown in detail
and described
on next page.
Elite
Medium Temperature
P/N 0453523
1-3
HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 U.S.A.
Add
Gasket Pad
Apply silicone
1.
2.
3.
4.
Apply more
silicone
Apply foam
Gaskets