2-10
r
efrIgeratIon
/e
leCtrICal
/C
ontroller
P/N 0520677_W
U.S. & Canada 1-800-922-1919 • Mexico 1-800-890-2900 • WWW.HUSSMANN.COM
INSTALLING PUMP & COLLECTION
PAN KIT
The bottom drain for defrost water from
the evaporator coil of the Freedom case is
connected to an evacuation pump which uses
plastic drain tubing to pump the water to the
condensate pan on top of the case.
Evaporation pan must be installed level and
plugged into electrical receptacle. The tubing
should be inspected through its entire length
to ensure that it has not been cut, kinked,
obstructed, or damaged during shipping and
installation.
Steps:
1. Remove cover plates.
2. Connect case wire whip to pump.
Pump & Collection Pan Kit
(sits underneath case)
1.
2.
Pump Connected to Case Wire Whip
Field-Installed Hose
Green
White
Black
Wiring for Pump
Connector
3-wire
12-18AWG
600V
3(Total)