![Hussmann Freedom Line series Installation & Operation Manual Download Page 31](http://html1.mh-extra.com/html/hussmann/freedom-line-series/freedom-line-series_installation-and-operation-manual_2189217031.webp)
P/N 0520677_W
2-7
HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 U.S.A.
Freedom Line Reach-in
Correctly tightened coupling
The swivel nut end contains one diaphragm in
the center post. The male fitting contains the
knife blades and its own diaphragm.
Top Piping Line Connection
(Continued from Page 2-4)
4. Insert foam filler into slot. Ensure there are
no gaps around foam filler. Place silicone
around the tubing.
4
Foam Filler
6
7
5. Replace bracket. Ensure insulation is on the
refrigeration lines before installing bracket.
Bracket is used to help keep the tubing
aligned.
6. Place the butyl tape over the slot.
7. Replace the cover plate. Take care to ensure
that cover plate is not in contact with tubing.
Fully Open
Fully Open
Bracket
Screw
5
4