1-10
I
nstallatIon
P/N 0520677_W
U.S. & Canada 1-800-922-1919 • Mexico 1-800-890-2900 • WWW.HUSSMANN.COM
2
Locate and remove any shipping
block(s) near the heat exchanger in
the interior bottom of each case, see
Figure 2.
Snap a chalk line on the floor to use
as a guide for positioning the front of
the cases in the line-up. The front base
frame should be on the chalk line.
3
Once cases are close to final place-
ment, remove the shipping braces
from the ends to be joined, see Figure
3. Discard bolts and flat washers used
to hold shipping braces. Bolts are too
long to be used for joining.
RMN
Figure 3. Remove Shipping Braces
d
o
noT
use
shipping
bolTs
To
join
cases
!
Shipping Brace
Figure 2. Remove Shipping Block(s)
(Some cases have more than one shipping block)
Shipping
Block
RLNI / RLNI