11 SERVICE WORK ON THE CHASSIS
38
–
Move the handlebar to and fro over the entire steering range.
The handlebar must be able to move easily over the entire steering range. No rest-
ing locations should be noticeable.
» If click positions are noticeable:
–
Adjust the play of the steering head bearing.
x
–
Check the steering head bearing and change if necessary.
Finishing work
–
Remove the motorcycle from the lift stand. (
11.14
Adjusting the play of the steering head bearing
x
Preparatory work
–
Raise the motorcycle with a lift stand. (
–
Remove the handlebar cushion.
B01873-10
Main work
–
Loosen screw
1
. Remove screw
2
.
–
Loosen and retighten screw
3
.
Guideline
Screw, top steering head
M20x1.5
12 Nm (8.9 lbf ft)
–
Using a plastic hammer, tap lightly on the upper triple clamp to avoid strains.
–
Fully tighten screws
1
.
Guideline
Screw, top triple clamp
M8
17 Nm (12.5 lbf ft)
–
Mount and tighten screw
2
.
Guideline
Screw, top steering stem
M8
17 Nm
(12.5 lbf ft)
Loctite
®
243™
–
Check the steering head bearing play. (
Finishing work
–
Mount the handlebar cushion.
–
Remove the motorcycle from the lift stand. (
11.15
Greasing the steering head bearing
x
800010-10
–
Remove the lower triple clamp.
–
Install the lower triple clamp.
11.16
Removing the start number plate
B01874-10
–
Take brake line
1
out of the brake line guide.
–
Remove screw
2
. Take off the start number plate.