MOUNTING THE CONTROLLER (ICC-800PP/ICC-800SAT) ..............................................
Plastic Pedestal Mounting
1. Set concrete forms using the installation instructions provided
with the controller. Allow 2" of conduit above the surface of the
concrete pad.
2. Assemble the mounting template. Twist one nut on each of the four
J-bolts and slide each bolt through the template. Put a washer and
nut on each J-bolt to secure it to the template (allow 2 ½" of thread
protruding above each nut).
3. Level the mounting template before the concrete sets.
4. After the concrete sets, remove the nuts and washers from the four
J-bolts slide the pedestal over the bolts. Secure the pedestal to the
bolts using the enclosed washers and nuts.
Thread Length 2.50" Min
Above Concrete
4"
26" Min
12.50"
5.00"
GCBL Wiring (Required For IMMS)
(3" Max Above Concrete)
Field Wiring
(3" Max Above Concrete)
Template
AC Power Wire S\P
(3" Max Above Concrete)
21" Min
Concrete Foundation