8
Cable Management
1
Raise the work surface to the highest position.
2
Remove the cable cover(s) from the column
and install the monitor cables through the cable clip(s).
3
Reinstall the cable covers.
4
Raise and lower the work surface a few times
to make sure the cables have enough slack.
Ready to use
1
Your QuickStand Eco is now ready to use.
Summary of Contents for QuickStand Eco
Page 2: ...QSE 1 0 Base with sloped edges QSE 1 5 Base with flat edges ...
Page 29: ...29 ...
Page 30: ...30 ...
Page 31: ......