M8*38mm
M8*38mm
x4
Ensure the stakes are
positioned into the
setting Post-Mix concrete.
Warning: Never
set the legs of the
playset in concrete.
Dig holes:
300mm x
300mm x
300mm deep.
Mark leg/hole position.
Not
Supplied.
Fill holes with Post-Mix concrete.
Fix stakes to legs.
Drill 3mm
Pilot holes
1
2
3
5
6
4
x4
TP814
300mm
300mm
300mm
B
B
B
B
M8*38mm
B
B
B
*11
12/20
64024
M 8x32 mm
2 x
64024
64026
2 x
64025
2 x
64026
M 8x32 mm
2
1
M 8x38 mm
2
1
64025
64026
3
9
10
11
11
3
9
15
3
9
15
11
11
33
3
46
45
45
7
Summary of Contents for 64024
Page 20: ......