\\CAD1\Standard\4591-72\Montageanleitung\Slackmaster_Kombination_2_4591_72_ST_B_L_1_GBR.doc
- 7 -
3 Delivery contents (parts list with part numbers)
3.1
In words
Table 3-1: Delivery contents, in words
Pos. Quantity Element /
Description
Size
O.K. Missing
01
4
Steel post
Lg. 3400 mm /
Ø 101,6 mm
02
4
Cover cap red
Ø 101,6 mm
03
6
Turnbuckle
(pre-assembled on
Pos. 04 + 09)
M12
04
1
Slackline
AM 4240 mm
05
1
Bowline
AM 3000 mm
06
1
Holding ring
AM 3000 mm
07
1
Garland Rope
AM 3000 mm
08
1
Hang loops
AM 3000 mm
09
2
Balancing rope
AM 3000 mm
10
4
HDPE plate with pipe clamp
Ø 490 mm
11
18
Pipe clamp
Ø 101,6 mm
12
12
Self-drilling screw
4,5 x 25 mm
13
4
Pipe clamp as ground anchor
Ø 101,6 mm
14
12
Carriage bolt
M8 x 35 mm
15
12
Acorn nut
M8
16
4
Pavement slab
(on site / by customer)
Ca. 300 x 300 mm
Summary of Contents for 4591-72
Page 13: ... CAD1 Standard 4591 72 Montageanleitung Slackmaster_Kombination_2_4591_72_ST_B_L_1_GBR doc 13 ...
Page 14: ...14 CAD1 Standard 4591 72 Montageanleitung Slackmaster_Kombination_2_4591_72_ST_B_L_1_GBR doc ...
Page 15: ... CAD1 Standard 4591 72 Montageanleitung Slackmaster_Kombination_2_4591_72_ST_B_L_1_GBR doc 15 ...
Page 16: ...16 CAD1 Standard 4591 72 Montageanleitung Slackmaster_Kombination_2_4591_72_ST_B_L_1_GBR doc ...
Page 17: ... CAD1 Standard 4591 72 Montageanleitung Slackmaster_Kombination_2_4591_72_ST_B_L_1_GBR doc 17 ...
Page 20: ......
Page 29: ......
Page 31: ......