24
\\CAD1\Standard\4591-72\Montageanleitung\Slackmaster_Kombination_2_4591_72_ST_B_L_1_GBR.doc
12 Half yearly maintenance
12.1 The stability of supporting posts, supports, foundations etc. has to be
checked. The safety level of the entire system has to be checked after
repairs have been carried out or additional system components have
been installed or replaced.
Annual Maintenance
13 Annual maintenance
13.1 Ascertaining that the equipment, foundations and surfaces are safe for
operation.
13.2 In particular, the equipment should be checked for decay and corrosion.
It may be necessary to dig out or excavate certain components in order
to do so. Zinc paint should be applied to corroded areas and scratches.
.
The equipment must be inspected by someone
with the necessary
expertise
in strict compliance with the instructions issued by Huck
Seiltechnik GmbH.
A copy of the inspection record should be given to the operator,
who must confirm receipt.
Summary of Contents for 4591-72
Page 13: ... CAD1 Standard 4591 72 Montageanleitung Slackmaster_Kombination_2_4591_72_ST_B_L_1_GBR doc 13 ...
Page 14: ...14 CAD1 Standard 4591 72 Montageanleitung Slackmaster_Kombination_2_4591_72_ST_B_L_1_GBR doc ...
Page 15: ... CAD1 Standard 4591 72 Montageanleitung Slackmaster_Kombination_2_4591_72_ST_B_L_1_GBR doc 15 ...
Page 16: ...16 CAD1 Standard 4591 72 Montageanleitung Slackmaster_Kombination_2_4591_72_ST_B_L_1_GBR doc ...
Page 17: ... CAD1 Standard 4591 72 Montageanleitung Slackmaster_Kombination_2_4591_72_ST_B_L_1_GBR doc 17 ...
Page 20: ......
Page 29: ......
Page 31: ......