Faults
Damages must be repaired as soon as they are detected. If serious
defects that affect the safetyness cannot be repaired straight away, the
playground item must be blocked with immediate effect.
7.10 Loose screws
Loose screws always cause quality problems and put safety at risk.
Therefore, loose screws should always be tightened and checks carried
out to ensure that there are no missing screws.
7.11 Preventing equipment use
Use of the equipment should be prevented in the event of incomplete
installation, disassembly, maintenance, repairs and faults.
7.12 Claims/liability for faults (steel poles)
Steel posts and footings are covered by our guarantee if refular maintenance
is carried out and recorded in writing.
Our general terms and conditions apply. Maintenance of steel poles first takes
place after 3 years. The steel posts must be excavated down to the
concrete foundations and checked for corrosion.
Zinc paint should be applied to any corroded areas and scratches.
Check ropes for abrasion, replace ropes where coating is damaged down the
Steel inlet.
Summary of Contents for 4591-72
Page 13: ... CAD1 Standard 4591 72 Montageanleitung Slackmaster_Kombination_2_4591_72_ST_B_L_1_GBR doc 13 ...
Page 14: ...14 CAD1 Standard 4591 72 Montageanleitung Slackmaster_Kombination_2_4591_72_ST_B_L_1_GBR doc ...
Page 15: ... CAD1 Standard 4591 72 Montageanleitung Slackmaster_Kombination_2_4591_72_ST_B_L_1_GBR doc 15 ...
Page 16: ...16 CAD1 Standard 4591 72 Montageanleitung Slackmaster_Kombination_2_4591_72_ST_B_L_1_GBR doc ...
Page 17: ... CAD1 Standard 4591 72 Montageanleitung Slackmaster_Kombination_2_4591_72_ST_B_L_1_GBR doc 17 ...
Page 20: ......
Page 29: ......
Page 31: ......