4
\\CAD1\Standard\4591-72\Montageanleitung\Slackmaster_Kombination_2_4591_72_ST_B_L_1_GBR.doc
1 Introduction Assembling
1.1
General information
This equipment should be installed, inspected, maintained and operated in
accordance with EN1176-7 guidelines.
Before installation work commences, please check that you have all of
the equipment and fixation components in the parts list provided (see
Tables 3-1 and 3-2).
Please consider that the installation has to be carried out only on even
terrain (max.slope up to 3%).
Any spare parts that may be required can be obtained directly from your
supplier or from Fa. Huck Seiltechnik GmbH
Adress:
Huck Seiltechnik GmbH
Dillerberg 3
D-35614 Aßlar/Berghausen
Tel. +49 6443 83 11-99
Fax +49 6443 83 11-79
Please do not hesitate to call your supplier
if you have any problems during
installation or with any other questions. You can reach us at the following
Tel.
+49 6443 83 11-99
Following installation, complete assembly instructions, maintenance
instructions and a maintenance record must be sent to the operator
who must confirm receipt in writing. See the last page of this document.
All nuts and bolts are hot-dip galvanised or stainless steel.
One of the characteristics of stainless steel is that uncontrolled cold
welding may occur when the nuts are tightened. To prevent this, it is
necessary to spray the nuts and bolts with Teflon spray or another
similar lubricant.
Summary of Contents for 4591-72
Page 13: ... CAD1 Standard 4591 72 Montageanleitung Slackmaster_Kombination_2_4591_72_ST_B_L_1_GBR doc 13 ...
Page 14: ...14 CAD1 Standard 4591 72 Montageanleitung Slackmaster_Kombination_2_4591_72_ST_B_L_1_GBR doc ...
Page 15: ... CAD1 Standard 4591 72 Montageanleitung Slackmaster_Kombination_2_4591_72_ST_B_L_1_GBR doc 15 ...
Page 16: ...16 CAD1 Standard 4591 72 Montageanleitung Slackmaster_Kombination_2_4591_72_ST_B_L_1_GBR doc ...
Page 17: ... CAD1 Standard 4591 72 Montageanleitung Slackmaster_Kombination_2_4591_72_ST_B_L_1_GBR doc 17 ...
Page 20: ......
Page 29: ......
Page 31: ......