Hubbell SPIKESHIELD HBL10P120B Installation Instruction Download Page 14

14

SpikeShield

® 

Non-Modular Surge Protective Device (SPD) 

WIRING

 

Hubbell Wiring Devices

 1-800-729-3406 | www.Hubbell-Wiring.com

Electrical equipment should be installed, operated, serviced, and maintained only by qualified personnel. 
No responsibility is assumed by Hubbell for any consequences arising out of the use of this material.

Wiring Diagrams with Integral 
Switch

Figure 6:

Single-Phase, 3-Wire, Grounded Installation with Integral Switch

8222-0013-07

SPD

A

N

C

N

= OK

= Replace / Sustituir / Remplacer

Phase A

Neutral

Ground

Customer Connections

Phase C

Figure 7:

Three-Phase, 3- or 4-Wire, Grounded Wye Installation wIth Integral Switch

Figure 8:

Three-Phase, 3- or 4-Wire, High-Leg Delta Installation with Integral Switch

8222-0013-08

N

SPD

A

N

C

B

= OK

= Replace / Sustituir / Remplacer

NOTE: The neutral conductor is not present on 3-wire, 
grounded neutral power systems. For these systems 
bond the neutral and ground lugs together.

Phase C

Phase A

Phase B

Neutral

Ground

Customer Connections

8222-0013-09

SPD

A
N

C

B

= OK

= Replace / Sustituir / Remplacer

NOTE: The high-leg of the power system must 
connect to phase B of the SPD. The neutral conductor 
is not present on three-wire grounded power systems. 
For these systems bond the neutral and ground lugs 
together inside the SPD using 10 AWG wire.

Phase A

Phase B

(High-Leg)

Phase C

Customer Connections

Ground

Neutral

Summary of Contents for SPIKESHIELD HBL10P120B

Page 1: ...SPIKESHIELD BRANCH PANEL Non Modular Surge Protective Device SPD Installation Instruction Catalog Numbers HBL3P120B HBL4P120B HBL6P120B HBL8P120B HBL10P120B 8222 0507A 06 2010 Retain for future use...

Page 2: ...ce 6 Equipment Performance 6 Electrical 7 Voltage Rating 7 Terminals Wire Size and Installation Torque 8 Branch Circuit Overcurrent Protection and Disconnect Means 8 Integral Switch 9 Location of SPD...

Page 3: ...onal protective equipment PPE and follow safe electrical work practices See NFPA 70E This equipment must only be installed and serviced by qualified electrical personnel Turn off all power supplying t...

Page 4: ...nal Sine Wave Tracking Module SPD Device Per Phase I2t Iapparent Ip Ith HBL_P120B 240 kA2 seconds 21 500 A RMS 48 000 A RMS 260 A CAUTION LOSS OF SURGE SUPPRESSION Do not energize the SPDs until the e...

Page 5: ...iced by qualified electrical personnel Turn off all power supplying this equipment before working on or inside equipment Always use a properly rated voltage sensing device to confirm power is off Repl...

Page 6: ...he location of the installation Mounting The device is designed to be surface or flush mounted Refer to the device submittal drawings or the product catalog for typical mounting dimensions and weight...

Page 7: ...es whether or not the transformer windings are referenced to earth via a grounding conductor The system configuration is not based on how any specific load or equipment is connected to a particular po...

Page 8: ...parate branch circuit or connected to a suitable existing branch circuit When connected to a separate dedicated branch circuit the OCPD setting must be selected to protect the conductors feeding the S...

Page 9: ...absence of voltage is verified maintenance may now be performed inside the SPD enclosure Upon completion of repairs close the door of the unit and turn the handle to the ON I position Location of SPD...

Page 10: ...voltage suppression by the SPD use a single point ground system where the service entrance grounding electrode system is connected to and bonded to all other available electrodes building steel metal...

Page 11: ...h to the surface of sheetrock or firewall construction Optional Integral Switch After making electrical cable connections to the SPD integral switch and prior to energizing the SPD ensure that the lin...

Page 12: ...ent If the SPD is properly installed and functioning the green LED indicators on the display will be lit If you have any questions pertaining to the installation of this device contact Hubbell at 1 80...

Page 13: ...Connections C A B N 8222 0013 05 SPD A N C B C B A OK Replace Sustituir Remplacer NOTE The neutral conductor is not present on 3 wire grounded neutral power systems For these systems bond the neutral...

Page 14: ...or 4 Wire Grounded Wye Installation wIth Integral Switch Figure 8 Three Phase 3 or 4 Wire High Leg Delta Installation with Integral Switch 8222 0013 08 N SPD A N C B OK Replace Sustituir Remplacer NO...

Page 15: ...had been cleared On an SPD module see Figure 9 if the left green LED is not lit it indicates a loss of suppression from line to ground for that phase If the right green LED is not lit it indicates a...

Page 16: ...loss to the diagnostic display panel To reset the surge counter remove all power and press the small switch located inside the unit on the underside of the diagnostic circuit board near the RJ45 conne...

Page 17: ...y use with energy levels in excess of those discussed in this instruction bulletin are not covered by warranty For application questions contact Hubbell at 1 800 729 3406 Care must be taken in install...

Page 18: ...ed LED will turn off the green LED will turn on and the alarm will shut off If suppression on any phase is lost the green LED will turn off the red LED will turn on and an alarm will sound The audible...

Page 19: ...CTRIC SHOCK EXPLOSION OR ARC FLASH Apply appropriate personal protective equipment PPE and follow safe electrical work practices See NFPA 70E This equipment must only be installed and serviced by qual...

Page 20: ...l distributor or refer to the product catalog SpikeShield modules Replacement instructions are included with the replacement parts Diagnostic display panel assemblies Replacement instructions are incl...

Reviews: