Hubbell SPIKESHIELD HBL10P120B Installation Instruction Download Page 12

12

SpikeShield

® 

Non-Modular Surge Protective Device (SPD) 

WIRING

 

Hubbell Wiring Devices

 1-800-729-3406 | www.Hubbell-Wiring.com

Electrical equipment should be installed, operated, serviced, and maintained only by qualified personnel. 
No responsibility is assumed by Hubbell for any consequences arising out of the use of this material.

Wiring

Follow the steps listed below when making wiring connections.

1. Turn off all power supplying this equipment before working on or inside 

any enclosure containing this equipment.

2. Confirm the SPD voltage rating and configuration is the same as the 

system voltage and power system configuration to which it will be 
connected.

3. Identify proper location for surge protective device. Locate as close as 

possible to the panel being addressed so the wires are as short as 
possible. Mount unit securely.

4. Install in accordance with National Electrical Code

®

 (NEC

®

) and local 

electrical codes for overcurrent protection recommendations and wire 
ampacity considerations.

5. Twist conductors 1/2 turn or more for every 12 inches of length. Do not 

loop or coil wires. Be sure to maintain adequate wire bending space per 
NEC.

6. If the remote signaling contacts of the diagnostic display panel are to be 

used, refer to the section, “Dry Contacts”, on page 17 for wiring 
instructions.

7. On a high-leg delta installation, note the high leg connection per wiring 

diagram. See Figure 5.

8. Replace all devices, doors, and covers, including the line barrier for the 

optional integral disconnect, before turning on power to the equipment. If 
the SPD is properly installed and functioning, the green LED indicators 
on the display will be lit.

If you have any questions pertaining to the installation of this device, contact 
Hubbell at 1-800-729-3406.

DANGER

HAZARD OF ELECTRIC SHOCK, EXPLOSION, OR ARC FLASH

• Apply appropriate personal protective equipment (PPE) and follow safe 

electrical work practices. See NFPA 70E.

• This equipment must only be installed and serviced by qualified 

electrical personnel.

• Turn off

 

all power supplying this equipment before working on or inside 

equipment.

• Always use a properly rated voltage sensing device to confirm power is off.

• Replace all devices, doors and covers before turning on power to this 

equipment.

• This equipment must be effectively grounded per all applicable codes. 

Use an equipment-grounding conductor to connect this equipment to 
the power system ground.

Failure to follow these instructions will result in death or serious injury.

DANGER

HAZARD OF ELECTRIC SHOCK, EXPLOSION, OR ARC FLASH

Confirm the SPD voltage rating on the module or nameplate label is the 
same as the operating voltage.

Failure to follow these instructions will result in death or serious injury.

NOTE: The surge protective device must be 
installed in an accessible location as described 
in the NEC

®

.

NOTE: The neutral connection is not present on 
3-wire, 3-phase wye ground or 2-wire single-
phase mid-point ground power systems. For 
these systems, bond the neutral and ground 
lugs together in the SPD. For installing wiring 
see Figures 3 through 8.

NOTE: See “Terminals, Wire Size, and 
Installation Torque” section for the acceptable 
wire size and installation torque on page 8.

NOTE: Always install the SPD on the LOAD 
side of the main Overcurrent Protection Device 
(OCPD).

Summary of Contents for SPIKESHIELD HBL10P120B

Page 1: ...SPIKESHIELD BRANCH PANEL Non Modular Surge Protective Device SPD Installation Instruction Catalog Numbers HBL3P120B HBL4P120B HBL6P120B HBL8P120B HBL10P120B 8222 0507A 06 2010 Retain for future use...

Page 2: ...ce 6 Equipment Performance 6 Electrical 7 Voltage Rating 7 Terminals Wire Size and Installation Torque 8 Branch Circuit Overcurrent Protection and Disconnect Means 8 Integral Switch 9 Location of SPD...

Page 3: ...onal protective equipment PPE and follow safe electrical work practices See NFPA 70E This equipment must only be installed and serviced by qualified electrical personnel Turn off all power supplying t...

Page 4: ...nal Sine Wave Tracking Module SPD Device Per Phase I2t Iapparent Ip Ith HBL_P120B 240 kA2 seconds 21 500 A RMS 48 000 A RMS 260 A CAUTION LOSS OF SURGE SUPPRESSION Do not energize the SPDs until the e...

Page 5: ...iced by qualified electrical personnel Turn off all power supplying this equipment before working on or inside equipment Always use a properly rated voltage sensing device to confirm power is off Repl...

Page 6: ...he location of the installation Mounting The device is designed to be surface or flush mounted Refer to the device submittal drawings or the product catalog for typical mounting dimensions and weight...

Page 7: ...es whether or not the transformer windings are referenced to earth via a grounding conductor The system configuration is not based on how any specific load or equipment is connected to a particular po...

Page 8: ...parate branch circuit or connected to a suitable existing branch circuit When connected to a separate dedicated branch circuit the OCPD setting must be selected to protect the conductors feeding the S...

Page 9: ...absence of voltage is verified maintenance may now be performed inside the SPD enclosure Upon completion of repairs close the door of the unit and turn the handle to the ON I position Location of SPD...

Page 10: ...voltage suppression by the SPD use a single point ground system where the service entrance grounding electrode system is connected to and bonded to all other available electrodes building steel metal...

Page 11: ...h to the surface of sheetrock or firewall construction Optional Integral Switch After making electrical cable connections to the SPD integral switch and prior to energizing the SPD ensure that the lin...

Page 12: ...ent If the SPD is properly installed and functioning the green LED indicators on the display will be lit If you have any questions pertaining to the installation of this device contact Hubbell at 1 80...

Page 13: ...Connections C A B N 8222 0013 05 SPD A N C B C B A OK Replace Sustituir Remplacer NOTE The neutral conductor is not present on 3 wire grounded neutral power systems For these systems bond the neutral...

Page 14: ...or 4 Wire Grounded Wye Installation wIth Integral Switch Figure 8 Three Phase 3 or 4 Wire High Leg Delta Installation with Integral Switch 8222 0013 08 N SPD A N C B OK Replace Sustituir Remplacer NO...

Page 15: ...had been cleared On an SPD module see Figure 9 if the left green LED is not lit it indicates a loss of suppression from line to ground for that phase If the right green LED is not lit it indicates a...

Page 16: ...loss to the diagnostic display panel To reset the surge counter remove all power and press the small switch located inside the unit on the underside of the diagnostic circuit board near the RJ45 conne...

Page 17: ...y use with energy levels in excess of those discussed in this instruction bulletin are not covered by warranty For application questions contact Hubbell at 1 800 729 3406 Care must be taken in install...

Page 18: ...ed LED will turn off the green LED will turn on and the alarm will shut off If suppression on any phase is lost the green LED will turn off the red LED will turn on and an alarm will sound The audible...

Page 19: ...CTRIC SHOCK EXPLOSION OR ARC FLASH Apply appropriate personal protective equipment PPE and follow safe electrical work practices See NFPA 70E This equipment must only be installed and serviced by qual...

Page 20: ...l distributor or refer to the product catalog SpikeShield modules Replacement instructions are included with the replacement parts Diagnostic display panel assemblies Replacement instructions are incl...

Reviews: