3
(
2
)
Operation Instructions
Turn on the power switch, the screen displays the boot screen as shown in below:
·Startup screen
Then the function selection interface appears
Press the "Function" key in this interface to move the cursor to each test item. Then press
the "Start and Stop" button to enter the corresponding test item.
Enter "Query", you can view the stored test record data, a total of 255 records can be
stored
Enter the "Settings" date and time adjustment, you can adjust the date and time.
DC high voltage generator test
:
1.Manual Test
In the function selection interface, select the manual test and press the start and stop key
to enter the manual test setting interface.
Intelligent DCHV Generator Welcome
Welcome
Manual Test
Auto Test
MOA Test
Cable Test
Setup
Query
Summary of Contents for HZZGF-Z Series
Page 14: ...11 2 Transformer 3 MOA...