background image

7

380V/220V

Use the special test line of mains

connection launcher (as shown in

figure 1), the host boot.

Use the special test line of

mains

Switchgear

induction

electric (~ 5 V)

Use switchgear induction electric test

line connection transmitter (see

switchgear induction electric

measuring point) host boot

Use switchgear induction

electric test line.

VII.The Test Results Analysis

Phase difference

value (f)

The phase difference is

stable

Results the

judgment

Added

0

5

Stable

In phase

Two lines with the

frequency,

Such as voltage.

115

125

or235

245

stable

phase-out

Two lines with the

frequency,

Such as voltage.

0

360

Is not stable, 0 ~ 360

degrees cycle changes

Two line

frequency is not

the same

Not parallel.

The value near 0

120

240

Stable

Two line voltage

is not the same.

Two lines the same

frequency, voltage,

Not parallel.

Summary of Contents for HZ-8600

Page 1: ...HZ 8600 Phasing Unit Huazheng Electric Manufacturing Baoding Co Ltd...

Page 2: ...ate the user must abide by the warning and safety regulations Please read the following instructions before use Warning please carefully read and understand the instruction manual before the use of th...

Page 3: ...1 III Security Matters 1 IV Technical Characteristic 1 V Introduction Of Instrument 2 VI The Nuclear Phase Operation 5 VII The Test Results Analysis 7 VII Instruments To Check 8 IX Maintenance 9 X Af...

Page 4: ...1 Insulating rod before using should be voltage withstand test 2 The standard configuration insulating rod length is 3 m corresponding voltage for 220 KV If the measurement circuit voltage higher tha...

Page 5: ...3 W 12 Host lithium battery capacity is about 2200 mAH transmitter battery capacity is about 350 mAH 14 Working environment temperature 35 45 humidity 95 RH 15 Storage conditions temperature 40 55 hum...

Page 6: ...rt press the close distance measurement and distance measurement switching Supplement 1 Top right corner have power indicator 2 The bottom jack is charging interface Emitter bottom Lamp Testing Two li...

Page 7: ...igure 1 Method 2 the emitter hooked up to the corresponding voltage grade of electric circuit inspection as shown in figure 2 or use the high pressure test equipment simulation of high voltage line fo...

Page 8: ...han 30 degrees are heterogeneous heterogeneous indicator voice prompt phase out please note at the same time Less than 30 degrees are in phase in phase indicator the voice prompt in phase at the same...

Page 9: ...ltage level instructions Instructions Added 500KV Launcher insulating rod 5 meters the hook on the high tension line directly host boot Conventional 330KV Launcher insulating rod 4 meters the hook on...

Page 10: ...tchgear induction electric test line VII The Test Results Analysis Phase difference value f The phase difference is stable Results the judgment Added 0 5 Stable In phase Two lines with the frequency S...

Page 11: ...rger After full charge indicator for the green light The emitter function Use the special test line of mains connection see figure 1 the mains The receiving host boot Buzzer rang 2 seconds the indicat...

Page 12: ...y the company free replacement new instrument 2 The instrument within one year quality problems by the company free repair 3 The instrument use more than a year the company is responsible for the long...

Page 13: ...he results of Standard values The test results 6 10 1 5 44 44 1 5 qualified 35 2 4 80 80 1 5 qualified 66 110 2 8 254 254 1 5 qualified 220 3 0 300 300 1 5 qualified Products comply with national GB31...

Page 14: ...11 7 Charger 2 8 9 Description Tip terminal replacement transmitter head hook When it is suitable for field operation more than hook please replace the hook with it after the operation...