background image

8

VIIl.Instruments To Check

Check the

project

Check the method

Normal

phenomenon

Abnormal

phenomenon

Exception handling

Insulating

rod pressure

Check pressure

performance

reference appendix

A

Leakage current

is less than 10

uA

Leakage current

is greater than 10

uA

Replace the

insulation rod

Transmitter

power

Unscrew the cap,

dial up the

transmitter switch

to open position.

Buzzer rang 2

seconds, the

indicator light

flashing in 1 and

2.

The buzzer rang,

or example, said

the battery is low.

The transmitter

switch, connect a

charger.

After full charge

indicator for the

green light.

The emitter

function

Use the special

test line of mains

connection (see

figure 1), the

mains. The

receiving host

boot.

Buzzer rang 2

seconds, the

indicator light

flashing in 1 and

2. The receiving

host display

corresponding

to the frequency

of the

transmitter.

In power under

normal

conditions, the

light is not

flashing, host

according to the

corresponding

frequency of 0 .

Transmitter failure,

returned to the

factory

maintenance.

The host

battery

The host boot

The battery

capacity is

greater than 1

Shows the battery

is too low, the

host automatically

power off.

After connect

charger, full of for

the green light .

The host

Host machine,

The host shows

Host shows the

Return to factory

Summary of Contents for HZ-8600

Page 1: ...HZ 8600 Phasing Unit Huazheng Electric Manufacturing Baoding Co Ltd...

Page 2: ...ate the user must abide by the warning and safety regulations Please read the following instructions before use Warning please carefully read and understand the instruction manual before the use of th...

Page 3: ...1 III Security Matters 1 IV Technical Characteristic 1 V Introduction Of Instrument 2 VI The Nuclear Phase Operation 5 VII The Test Results Analysis 7 VII Instruments To Check 8 IX Maintenance 9 X Af...

Page 4: ...1 Insulating rod before using should be voltage withstand test 2 The standard configuration insulating rod length is 3 m corresponding voltage for 220 KV If the measurement circuit voltage higher tha...

Page 5: ...3 W 12 Host lithium battery capacity is about 2200 mAH transmitter battery capacity is about 350 mAH 14 Working environment temperature 35 45 humidity 95 RH 15 Storage conditions temperature 40 55 hum...

Page 6: ...rt press the close distance measurement and distance measurement switching Supplement 1 Top right corner have power indicator 2 The bottom jack is charging interface Emitter bottom Lamp Testing Two li...

Page 7: ...igure 1 Method 2 the emitter hooked up to the corresponding voltage grade of electric circuit inspection as shown in figure 2 or use the high pressure test equipment simulation of high voltage line fo...

Page 8: ...han 30 degrees are heterogeneous heterogeneous indicator voice prompt phase out please note at the same time Less than 30 degrees are in phase in phase indicator the voice prompt in phase at the same...

Page 9: ...ltage level instructions Instructions Added 500KV Launcher insulating rod 5 meters the hook on the high tension line directly host boot Conventional 330KV Launcher insulating rod 4 meters the hook on...

Page 10: ...tchgear induction electric test line VII The Test Results Analysis Phase difference value f The phase difference is stable Results the judgment Added 0 5 Stable In phase Two lines with the frequency S...

Page 11: ...rger After full charge indicator for the green light The emitter function Use the special test line of mains connection see figure 1 the mains The receiving host boot Buzzer rang 2 seconds the indicat...

Page 12: ...y the company free replacement new instrument 2 The instrument within one year quality problems by the company free repair 3 The instrument use more than a year the company is responsible for the long...

Page 13: ...he results of Standard values The test results 6 10 1 5 44 44 1 5 qualified 35 2 4 80 80 1 5 qualified 66 110 2 8 254 254 1 5 qualified 220 3 0 300 300 1 5 qualified Products comply with national GB31...

Page 14: ...11 7 Charger 2 8 9 Description Tip terminal replacement transmitter head hook When it is suitable for field operation more than hook please replace the hook with it after the operation...

Reviews: