11
XI.Matters Needing Attention
When testing the no-load tap-changer winding, it is not allowed to switch off the
no-load tap-changer during the testing process or when the power is not fully
discharged.
It is not allowed to dismantle the test line and cut off the power switch during the test
or discharge process.
In the process of testing transformers, the unmeasured side winding must be
opened.
XII.Packing List
No.
Item
Qty
1
Main engine
1
2
Power line
1
3
Red test line
1
4
Black test line
1
5
Yellow test line
1
6
Green test line
1