UPS5000-E-(25 kVA-75 kVA)-BF
User Manual
3 Installation
Issue 07 (2019-12-13)
Copyright © Huawei Technologies Co., Ltd.
81
Figure 3-49
Installing connecting kits
Step 3
Install battery modules after cables are connected.
To prevent electric shocks, install battery modules after cables are connected.
----End
3.3 Installing a Parallel System
3.3.1 Installing the UPSs
Context
Connect parallel plates to reinforce the cabinet combination.