
Appearance, Specifications, and Name
Wire stripper
Insulation tape
Cotton cloth
Brush
Heat shrink
tubing
Heat gun
Electrician's knife
Protective gloves
ESD gloves
Insulation gloves
Hydraulic pliers
Cable tie
3.3 Installing a UPS
Rack-Mounting a UPS
NO TE
● Reserve a space of 1 U in the middle of four batteries for routing battery power cables.
● Reserve a space of 5 cm between the battery communications port and the cabinet for
installing a communications cable.
● Reserve a space of 44 mm between the battery edge and the rack edge for installing
battery power cables.
● In rack-mounted installation scenarios, the front panels of the UPS and lithium batteries
are not on the same plane.
● The guide rails for the UPS2000-G-6KRTLL are 592.37 mm to 807.37 mm long, 30 mm
wide, and 87 mm high. The guide rails are scalable and support Huawei M-shaped
cabinets.
1. Install the mounting ears on both sides of the UPS.
2. Install the guide rails on the rack, and then install the UPSs and batteries with
mounting ears on the rack.
UPS2000-G-6KRTLL
User Manual
3 Installation
Issue 01 (2020-08-06)
Copyright © Huawei Technologies Co., Ltd.
25