Table 2-2
DC PDU configurations
DC Output
Standard Configuration
Battery circuit breaker
Four 1-pole 125 A circuit breakers
Load circuit breaker
BLVD circuit breaker: two 1-pole 100 A
circuit breakers and two 1-pole 16 A
circuit breakers
LLVD circuit breaker: one 1-pole 63 A
circuit breaker, one 1-pole 32 A circuit
breaker, and one 1-pole 16 A circuit
breaker
NOTE
Two 16 A BLVD circuit breakers supply
power for the TECs in the two battery
cabinets.
If a lamp is configured, use one appropriate
load circuit breaker for it.
Battery Switch
Figure 2-7
Battery switch
(1) Battery switch
The battery switch is set to AUTO by default before delivery, meaning that the system is
under automatic control.
Open the panel and set the battery switch to MANUAL only when you want to power on
the battery forcibly for commissioning. Remember to set the battery switch back to AUTO
after the commissioning.