background image

SUN2000-(5KTL, 6KTL)-M0 
User Manual 

4 Installation 

 

Issue 03 (2019-07-19) 

Copyright © Huawei Technologies Co., Ltd. 

27 

 

 

 

Prepare an anti-theft lock suitable for the lock hole diameter (Ф8 mm) by yourself. 

 

An outdoor waterproof lock is recommended. 

 

Keep the key to the anti-theft lock safe. 

Figure 4-15

 

Installing the anti-theft lock 

 

----End 

Summary of Contents for SUN2000-5KTL-M0

Page 1: ...SUN2000 5KTL 6KTL M0 User Manual Issue 03 Date 2019 07 19 HUAWEI TECHNOLOGIES CO LTD ...

Page 2: ...stomer All or part of the products services and features described in this document may not be within the purchase scope or the usage scope Unless otherwise specified in the contract all statements information and recommendations in this document are provided AS IS without warranties guarantees or representations of any kind either express or implied The information in this document is subject to ...

Page 3: ...e This document is intended for Installers Users Symbol Conventions The symbols that may be found in this document are defined as follows Symbol Description Indicates an imminently hazardous situation which if not avoided will result in serious injury or death Indicates a potentially hazardous situation which if not avoided could result in serious injury or death Indicates a potentially hazardous ...

Page 4: ...ry Changes between document issues are cumulative The latest document issue contains all updates made in previous issues Issue 03 2019 07 19 Added 6 3 Commissioning Added E Starting AFCI Check Added F IPS Test for Italy CEI0 21 Grid Code only Updated B Setting Dry Contact Scheduling Parameters Added C Setting Export Limitation Parameters Added D Setting Voltage Rise Suppression Q U Curve Issue 02 ...

Page 5: ...Installation Position 17 4 3 1 Environment Requirements 17 4 3 2 Space Requirements 17 4 4 Installing the Mounting Bracket 21 4 4 1 Wall mounted Installation 22 4 4 2 Support mounted Installation 24 5 Electrical Connections 28 5 1 Preparing for Installation 29 5 2 Connecting the PE cable 31 5 3 Connecting the AC Output Power Cable 33 5 4 Connecting the DC input power cable 37 5 5 Optional Installi...

Page 6: ...wering Off the System 59 7 Maintenance 60 7 1 Routine Maintenance 60 7 2 Troubleshooting 61 8 Handling the Inverter 68 8 1 Removing the SUN2000 68 8 2 Packing the SUN2000 68 8 3 Disposing of the SUN2000 68 9 Technical Data 69 A Grid Codes 73 B Setting Dry Contact Scheduling Parameters 76 C Setting Export Limitation Parameters 78 D Setting Voltage Rise Suppression Q U Curve 81 E Starting AFCI Check...

Page 7: ... Huawei will not be liable for any consequence caused by the violation of the safety operation regulations and design production and usage standards Disclaimer Huawei shall not be liable for any consequence caused by any of the following events Damage during the transportation by the customer Storage conditions that do not meet the requirements specified in this document Incorrect storage installa...

Page 8: ...0 is not connected to a power supply or powered on before finishing installation Ensure that the SUN2000 is installed in a well ventilated environment Ensure that the SUN2000 heat sinks are free from blockage Do not open the front panel of the SUN2000 Do not remove the terminals and ports at the bottom of the SUN2000 Grounding When installing the device always make the ground connection first and ...

Page 9: ...rtification which affects the normal operation of the SUN2000 Maintenance and Replacement High voltage may cause an electric shock which results in serious property damage serious injury or death or serious property damage from the SUN2000 in operation Prior to maintenance power off the SUN2000 and strictly comply with the safety precautions in this document and associated documents when operating...

Page 10: ...ower and feeds the power into the power grid This document involves the following product models SUN2000 5KTL M0 SUN2000 6KTL M0 Figure 2 1 Model description SUN2000 5KTL M0 as an example Table 2 1 Model description Icon Meaning Description 1 Product SUN2000 three phase grid tied PV string inverter 2 Power level 5K The rated power is 5 kW 6K The rated power is 6 kW 3 Topology TL transformerless 4 ...

Page 11: ... application optional in dashed boxes indicates a power cable indicates a signal cable indicates wireless communication If the inverter is connected to the FusionSolar app over its built in WiFi network only local commissioning can be performed A PV string B DC switch C SUN2000 D AC switch E ACDU F Smart Power Sensor G Power grid H 4G Smart Dongle I WLAN Smart Dongle J Router K FusionSolar managem...

Page 12: ...sue 03 2019 07 19 Copyright Huawei Technologies Co Ltd 6 Figure 2 3 Supported power grids In a TT power grid the N PE voltage should be lower than 30 V In an IT power grid you need to set Isolation settings to Input not grounded with a transformer ...

Page 13: ...le port GPRS 4G WLAN 10 Battery terminals BAT BAT reserved 11 DC input terminals PV2 PV2 12 DC input terminals PV1 PV1 13 DC switch DC SWITCH Battery terminals BAT BAT are reserved and the integrated battery solution has not been released yet Two M6 screw holes are reserved on the sides of the enclosure for installing an awning Table 2 2 LED indicator description Category Status Meaning Running in...

Page 14: ...f and AC is on Off Off DC and AC are both off Blinking red at short intervals on for 0 2s and then off for 0 2s N A DC environmental alarm N A Blinking red at short intervals on for 0 2s and then off for 0 2s AC environmental alarm Steady red Steady red Fault Communication indication LED 3 N A Blinking green at short intervals on for 0 2s and then off for 0 2s Communication is in progress When a m...

Page 15: ... warning label High voltage exists after the SUN2000 is powered on Only qualified and trained electrical technicians are allowed to perform operations on the SUN2000 High touch current exists after the SUN2000 is powered on Ensure that the SUN2000 has been grounded before powering on it Refer to documentation Reminds operators to refer to the documents shipped with the SUN2000 Grounding Indicates ...

Page 16: ... network 2 3 2 Product Nameplate Figure 2 5 Nameplate SUN2000 5KTL M0 as an example 1 Trademark and product model 2 Important technical specifications 3 Compliance symbols 4 Company name and country of manufacture The nameplate figure is for reference only Symbol Name Meaning TÜVRheinland certification mark The SUN2000 complies with TÜVRheinland certification standards Australia RCM certification ...

Page 17: ... EU waste electrical and electronic equipment WEEE mark Do not dispose of the product as household garbage 2 4 Working Principles 2 4 1 Circuit Diagram Two PV strings connect to the SUN2000 and their maximum power points are tracked by two maximum power point tracking MPPT circuits The SUN2000 converts DC power into three phase AC power through an inverter circuit Surge protection is supported on ...

Page 18: ...Operating mode once the operating requirements are met The SUN2000 enters Shutdown mode after detecting a shutdown command or a fault after startup Operating In Operating mode The SUN2000 converts DC power from PV strings into AC power and feeds the power to the power grid The SUN2000 tracks the maximum power point to maximize the PV string output If the SUN2000 detects a fault or a shutdown comma...

Page 19: ...ei Technologies Co Ltd 13 Working Mode Description Shutdown In Standby or Operating mode the SUN2000 enters Shutdown mode after detecting a fault or shutdown command In Shutdown mode the SUN2000 enters Standby mode after detecting a startup command or that the fault is rectified ...

Page 20: ... 5 95 RH The SUN2000 should be stored in a clean and dry place and be protected from dust and water vapor corrosion A maximum of eight SUN2000s can be stacked To avoid personal injury or device damage stack SUN2000s with caution to prevent them from falling over Periodic inspections are required during the storage Replace the packing materials if necessary If the SUN2000 has been long term stored ...

Page 21: ...equested do not unpack the package and contact your supplier as soon as possible You are advised to remove the packing materials within 24 hours before installing the inverter Package Contents After unpacking the inverter check that the contents are intact and complete If any damage is found or any component is missing contact your supplier For details about the number of contents see the Packing ...

Page 22: ...ufacturer Amphenol Rubber mallet Utility knife Cable cutter Crimping tool Model H4TC0003 H4TC000 2 manufacturer Amphenol Multimeter DC voltage measurement range 1100 V DC Vacuum cleaner Marker Measuring tape Bubble or digital level OT terminal crimping tool Heat shrink tubing Heat gun Cable tie N A PPE Safety gloves Safety goggles Anti dust respirator Safety shoes ...

Page 23: ...ons and monsoons or terrains such as dams and hills The SUN2000 must be installed in a well ventilated environment to ensure good heat dissipation Recommended Install the SUN2000 in a sheltered place or a place with an awning Mounting Structure Requirements The mounting structure where the SUN2000 is installed must be fireproof Do not install the SUN2000 on flammable building materials The SUN2000...

Page 24: ...nstallation Issue 03 2019 07 19 Copyright Huawei Technologies Co Ltd 18 Figure 4 1 Installation tilts Installation Space Requirements Reserve enough space around the SUN2000 to ensure sufficient space for installation and heat dissipation ...

Page 25: ...s Co Ltd 19 Figure 4 2 Installation space When installing multiple SUN2000s install them in horizontal mode if sufficient space is available and install them in triangle mode if no sufficient space is available Stacked installation is not recommended Figure 4 3 Horizontal installation recommended ...

Page 26: ...SUN2000 5KTL 6KTL M0 User Manual 4 Installation Issue 03 2019 07 19 Copyright Huawei Technologies Co Ltd 20 Figure 4 4 Staggered installation recommended ...

Page 27: ...ation Issue 03 2019 07 19 Copyright Huawei Technologies Co Ltd 21 Figure 4 5 Stacked installation not recommended 4 4 Installing the Mounting Bracket Installation Precautions Figure 4 6 shows the dimensions of installation holes on the SUN2000 ...

Page 28: ... holes and mark the positions using a marker Step 2 Secure the mounting brackets M6x60 expansion bolts are delivered with the SUN2000 If the length and amount of the bolts do not meet installation requirements prepare M6 stainless steel expansion bolts by yourself Figure 4 7 Expansion bolt composition 1 Bolt 2 Nut 3 Spring washer 4 Flat washer 5 Expansion tube Avoid drilling holes in the utility p...

Page 29: ...f large hole tolerance exists position and drill holes again After removing the bolt spring washer and flat washer level the front of the expansion tube with the concrete wall Otherwise the mounting brackets will not stay steady on the concrete wall Partially loosen the nut flat washer and spring washer of the two expansion bolts below Figure 4 8 Installing the Mounting Bracket Step 3 Install the ...

Page 30: ...y to the anti theft lock safe Figure 4 10 Installing the anti theft lock End 4 4 2 Support mounted Installation Prerequisites Prepare M6 stainless bolt assemblies including flat washers spring washers and M6 bolts with appropriate lengths as well as matched flat washers and nuts based on the support specifications Procedure Step 1 Determine the hole positions based on the marking off template and ...

Page 31: ...07 19 Copyright Huawei Technologies Co Ltd 25 Figure 4 11 Determining hole positions Step 2 Drill holes using a hammer drill You are advised to apply anti rust paint on the hole positions for protection Figure 4 12 Drilling holes Step 3 Secure the mounting bracket ...

Page 32: ... 2019 07 19 Copyright Huawei Technologies Co Ltd 26 Figure 4 13 Securing the mounting bracket Step 4 Install the SUN2000 onto the mounting bracket Step 5 Tighten the bolt assembly Figure 4 14 Installing the SUN2000 Step 6 Optional Install the anti theft lock ...

Page 33: ...019 07 19 Copyright Huawei Technologies Co Ltd 27 Prepare an anti theft lock suitable for the lock hole diameter Ф8 mm by yourself An outdoor waterproof lock is recommended Keep the key to the anti theft lock safe Figure 4 15 Installing the anti theft lock End ...

Page 34: ... the high voltage of the SUN2000 may result in electric shocks The equipment damage caused by incorrect cable connections is beyond the warranty scope Only certified electricians are allowed to connect cables Operation personnel must wear proper PPE when connecting cables The cable colors shown in the electrical connection diagrams provided in this chapter are for reference only Select cables in a...

Page 35: ...nent Description Source A PV module A PV string is composed of the PV modules connected in series The PV modules can work with an optimizer The SUN2000 supports the input from two PV strings Prepared by the customer B DC switch Recommended a PV circuit breaker with a rated voltage greater than or equal to 1 100 V DC and a rated current of 15 A Prepared by the customer C Smart Dongle Supported mode...

Page 36: ...epared by the customer Table 5 2 Cable description No Name Type Specifications 1 DC input power cable Standard PV cable in the industry Conductor cross sectional area 4 6 mm2 Cable outer diameter 4 5 7 8 mm 2 Optional RS485 communications cable used to cascade inverters or connect to the RS485 signal port on the SmartLogger Two core outdoor shielded twisted pair cable Conductor cross sectional are...

Page 37: ...sure After the ground cable is installed it is recommended that the silica gel or paint be applied to the ground terminal for protection Additional Information The SUN2000 has the grounding detection function This function detects whether the SUN2000 is grounded properly before its startup or whether the ground cable is disconnected when the SUN2000 is running This function works under limited con...

Page 38: ...C output cable and ground the PE terminal on the AC connector and the ground screw on the enclosure respectively Procedure Step 1 Crimp the OT terminal Pay attention not to damage the core wire when stripping a cable The cavity formed after crimping the conductor strip of the OT terminal needs to wrap the core wire completely The core wire needs to contact the OT terminal closely Wrap the wire cri...

Page 39: ... switch directly connected to it The SUN2000 is integrated with a comprehensive residual current monitoring unit Once detecting that the residual current exceeds the threshold the SUN2000 immediately disconnects itself from the power grid If the external AC switch can perform earth leakage protection the rated leakage action current should be greater than or equal to 100 mA If multiple SUN2000s co...

Page 40: ...sure that the cable jacket is inside the connector Ensure that the exposed core wire is totally inserted into the cable hole Ensure that AC terminations provide firm and solid electrical connections Failing to do so may cause SUN2000 malfunction and damage to its AC connectors Ensure that the cable is not twisted Figure 5 5 Three core cable L1 L2 and L3 ...

Page 41: ...SUN2000 5KTL 6KTL M0 User Manual 5 Electrical Connections Issue 03 2019 07 19 Copyright Huawei Technologies Co Ltd 35 Figure 5 6 Four core cable L1 L2 L3 and PE Figure 5 7 Four core cable L1 L2 L3 and N ...

Page 42: ... L3 N and PE The cable colors shown in the figures are for reference only Select an appropriate cable according to local standards Step 2 Connect the AC connector to the AC output port Ensure that the AC connector is connected securely Figure 5 9 Securing theAC connector Step 3 Check the route of the AC output power cable Figure 5 10 Cable route End ...

Page 43: ... the watertight cap from the terminal Otherwise the IP rating of the SUN2000 will be affected Ensure that the following conditions are met Otherwise the SUN2000 may be damaged or even a fire could happen PV modules connected in series in each PV string are of the same specifications The open circuit voltage of each PV string is always lower than or equal to 1100 V DC The maximum short circuit curr...

Page 44: ...f PV strings and the SUN2000 the positive or negative terminals of PV strings may be short circuited to ground if power cables are not properly installed or routed An AC or DC short circuit may occur and damage the device when the SUN2000 is operating The caused device damage is not covered under any warranty Terminal Description Figure 5 11 Terminals 1 DC input terminals 2 Battery terminals Figur...

Page 45: ...t cable connections After crimping the positive and negative metal contacts pull the DC input power cables back to ensure that they are connected securely Insert the crimped metal contacts of the positive and negative power cables into the appropriate positive and negative connectors Then pull back the DC input power cables to ensure that they are connected securely Crimp the metal stamping formin...

Page 46: ...evice damage is not covered under any warranty Wait until the solar irradiance declines and the PV string current drops to below 0 5 A Then set the two DC SWITCH to the OFF position remove the positive and negative connectors and rectify the connection of the DC input power cable End Removing a DC connector Before removing the positive and negative connectors ensure that the DC SWITCH is OFF To re...

Page 47: ...n installing a SIM card you can determine the SIM card installation direction based on the silk screen and arrow mark on the slot When being pressed into place the SIM card will be locked which means that the card is installed correctly To remove the SIM card push it inwards Then the SIM card springs out automatically When reinstalling the 4G Smart Dongle ensure that the buckle springs back in pla...

Page 48: ... on Function Description 1 485A1 1 RS485A RS485 differential signal Used to cascadeinverters or connect to the RS485 signal port on the SmartLogger 2 485A1 2 RS485A RS485 differential signal Used to cascadeinvert ers or connect to the RS485 signal port on the SmartLogger 3 485B1 1 RS485B RS485 differential signal 4 485B1 2 RS485B RS485 differential signal 5 PE Shield layer grounding N A 6 PE Shiel...

Page 49: ...ted to the inverter 485A2 pin 7 485B2 pin 9 and PE pin 5 are shared When the enable signal cable of the energy storage device and the signal cable of the rapid shutdown switch are both connected to the inverter GND pin 13 is shared Communication Networking Single Inverter Smart Dongle Networking Figure 5 18 Smart Dongle networking In the Smart Dongle networking scenario the SmartLogger1000A cannot...

Page 50: ...as inverters Smart Power sensor and EMI You are advised to connect fewer than 30 devices to each RS485 route The Smart Power Sensor is necessary for export limitation Select the Smart Power Sensor according to the actual project To ensure the system response speed the Smart Power Sensor is recommended to be connected to a COM port separately from inverter COM port 5 6 1 Connecting the RS485 Commun...

Page 51: ...gure 5 20 Installing the cable Step 2 Connect the signal cable connector to the COM port Figure 5 21 Securing the signal cable connector End 5 6 2 Connecting the RS485 Communications Cable Smart Power Sensor Cable Connection The following figure shows the cable connections between the inverter and the Smart Power Sensor ...

Page 52: ...cal Connections Issue 03 2019 07 19 Copyright Huawei Technologies Co Ltd 46 Figure 5 22 Cable connection 1 Shielding layer of the signal cable Connecting Only the Smart Power Sensor Step 1 Connect the signal cable to the signal cable connector ...

Page 53: ...ht Huawei Technologies Co Ltd 47 Figure 5 23 Installing the cable Step 2 Connect the signal cable to the COM port Figure 5 24 Securing the signal cable connector End Connecting the Smart Power Sensor and Energy Storage Device Step 1 Connect the signal cable to the signal cable connector ...

Page 54: ...Ltd 48 Figure 5 25 Installing the cable Step 2 Connect the signal cable to the COM port Figure 5 26 Securing the signal cable connector End 5 6 3 Connecting the Power Grid Scheduling Signal Cable Cable Connection The following figure shows the cable connections between the inverter and the Ripple Control Device ...

Page 55: ...nections Issue 03 2019 07 19 Copyright Huawei Technologies Co Ltd 49 Figure 5 27 Cable connection Procedure Step 1 Connect the signal cable to the signal cable connector Figure 5 28 Installing the cable Step 2 Connect the signal cable to the COM port ...

Page 56: ...SUN2000 5KTL 6KTL M0 User Manual 5 Electrical Connections Issue 03 2019 07 19 Copyright Huawei Technologies Co Ltd 50 Figure 5 29 Securing the signal cable connector End ...

Page 57: ...perly as required by the customer 4 Cable tie Cable ties are secured evenly and no burr exists 5 Grounding The ground cable is connected correctly securely and reliably 6 Turn off the switches The DC SWITCH and all the switches connected to the SUN2000 are set to OFF 7 Cable connections The AC output power cable and DC input power cable are connected correctly securely and reliably 8 Unused termin...

Page 58: ... SUN2000 to the ON position Step 3 Wait for about 1 minute and then observe the LED indicators of the inverter to check the running status Table 6 2 LED indicator description Category Status Meaning Running indication LED 1 LED 2 N A Steady green Steady green The SUN2000 is operating in grid tied mode Blinking green at long intervals on for 1s and then off for 1s Off The DC is on and the AC is off...

Page 59: ...n a mobile phone is connected to the SUN2000 the indicator first indicates that the phone is connected to the SUN2000 blinks green at long intervals Blinking green at long intervals on for 1s and then off for 1s The mobile phone is connected to the SUN2000 Off There is no communication End 6 3 Commissioning 6 3 1 Scenario 1 Single inverter Smart Dongle Downloading the App Search for FusionSolar fr...

Page 60: ...rresponding QR code download the installation package and install the FusionHome app by following the instructions Google Play Android App Store iOS Figure 6 2 FusionHome QR code The initial password for connecting the inverter WiFi is Changeme Log in to the FusionHome app as installer The initial password is 00000a Use the initial password upon first power on and change it immediately after login...

Page 61: ...eating the first installer account will generate a domain named after the company If you have an installer account skip this step Figure 6 3 Creating the first installer account To create multiple installer accounts for the same company log in to the FusionSolar app and tap New User Figure 6 4 Creating multiple installer accounts for the same company ...

Page 62: ...nd an Account for User For details see the FusionSolar App Quick Guide You can scan the QR code to obtain it 6 3 2 Scenario 2 Multiple Inverters SmartLogger1000A See the Distributed PV Plants Connecting to Huawei Hosting Cloud Quick Guide Distributed Inverters SmartLogger1000A RS485 Networking You can scan the QR code to obtain it 6 3 3 Other Scenarios 1 Access Inverter commissioning ...

Page 63: ...mobile phone must be less than 5 m without obstructions in between to ensure the communication quality between the FusionSolar app and inverter The distance is for reference only and may vary depending on mobile phones and whether there are obstructions between the inverter and the mobile phone When connecting the SUN2000L to the FusionSolar app over a router ensure that the mobile phone and inver...

Page 64: ... 6 8 Quick settings The initial password for connecting the inverter WiFi is Changeme The initial password of the installer is 00000a Use the initial password upon first power on and change it immediately after login To ensure account security change the password periodically and keep the new password in mind Not changing the initial password may cause password disclosure A password left unchanged...

Page 65: ...ed off the remaining electricity and heat may still cause electric shocks or body burns Therefore put on protective gloves and operate the SUN2000 five minutes after the power off Procedure Step 1 Send a shutdown command from the app Step 2 Turn off the AC switch between the SUN2000 and the power grid Step 3 Set the DC SWITCH at the bottom of the SUN2000 to the OFF position Step 4 Turn off the DC ...

Page 66: ...ance Interval System cleanliness Check the heat sink for foreign matter or the overall health of the SUN2000 Annual or every time an abnormality is detected System running status Check the SUN2000 for damage or deformation Annual Electrical connections Cables are securely connected Cables are intact in particular the parts touching the metallic surface are not scratched The first inspection is 6 m...

Page 67: ...ectly configure the PV array the inverter alarm disappears automatically 2002 DC Arc Fault Major The PV string power cable arcs or is in poor contact Cause ID 1 PV1 Cause ID 2 PV2 Check whether the string cables arc or are in poor contact 2011 String Reversed Major The PV string is reversely connected Cause ID 1 PV1 Cause ID 2 PV2 Check whether the PV string is reversely connected to the SUN2000 I...

Page 68: ...e local power operator If yes log in to the mobile phone app SmartLogger or NMS to modify the grid undervoltage protection threshold with the consent of the local power operator 3 If the fault persists for a long time check the connection between the AC switch and the output power cable 2034 Grid Overvolta ge Major Cause ID 1 The power grid voltage is beyond the upper threshold or the overvoltage ...

Page 69: ...1 If the alarm occurs occasionally the power grid may be abnormal temporarily The SUN2000 automatically recovers after detecting that the power grid becomes normal 2 If the alarm occurs frequently check whether the grid frequency is within the acceptable range If no contact the local power operator If yes log in to the mobile phone app SmartLogger or NMS to modify the grid overfrequency protection...

Page 70: ...s triggered 1 The SUN2000 detects its external working conditions in real time After the fault is rectified it automatically recovers 2 If the alarm occurs frequently and affects the power production of the PV plant check whether the output is short circuited If the fault persists contact your dealer or Huawei technical support 2040 Output DC Compone nt Overhigh Major Cause ID 1 The DC component o...

Page 71: ...and the ground is poor 1 Check the output resistance of the PV array to ground If there is a short circuit or lack of insulation rectify it 2 Check that the PE cable of the SUN2000 is correctly connected 3 If you are sure that the impedance is less than the default value in a cloudy or rainy environment log in to the mobile phone app SmartLogger or NMS and reset the insulation impedance protection...

Page 72: ...cate has entered the grace period The privilege feature will be invalid soon 1 Apply for a new certificate 2 Load the new certificate 61440 Monitorin g Unit Faulty Minor Cause ID 1 1 The flash memory is insufficient 2 The flash memory has bad sectors Turn off the AC output switch and then the DC input switch After 5 minutes turn on the AC output switch and then the DC input switch If the fault per...

Page 73: ...r the grid connection voltage exceeds the upper threshold If yes contact the local power operator 2 If you have confirmed that the grid tied voltage exceeds the upper threshold and have obtained the consent of the local power operator modify the overvoltage protection threshold through the mobile phone app SmartLogger or NMS 3 Check whether the peak power grid voltage exceeds the upper threshold C...

Page 74: ... cables from the SUN2000 including RS485 communications cables DC input power cables AC output power cables and PGND cables 2 Remove the SUN2000 from the mounting bracket 3 Remove the mounting bracket 8 2 Packing the SUN2000 If the original packing materials are available put the SUN2000 inside them and then seal them by using adhesive tape If the original packing materials are not available put t...

Page 75: ...imum efficiency 98 40 98 60 European efficiency 97 50 97 70 Input Technical Specifications SUN2000 5KTL M0 SUN2000 6KTL M0 Maximum input voltagea 1100 V Operating voltage rangeb 140 980 V Maximum input current per MPPT 11 A Maximum short circuit current per MPPT 15 A Maximum inverter backfeed current to the PV array 0 A Minimum startup voltage 200 V Full load MPPT voltage range 240 850 V 285 850 V...

Page 76: ...er may be damaged Note b If the input voltage is beyond the operating voltage range the solar inverter cannot work properly Output Technical Specifications SUN2000 5KTL M0 SUN2000 6KTL M0 Rated active power 5000 W 6000 W Maximum apparent power 5500 VA 6600 VA Maximum active power cosφ 1 5500 W 6000 W Rated output voltage 220 380 V 230 400 V 3W N PE Rated output current 7 6 A 380 V 7 3 A 400 V 9 1 ...

Page 77: ...tion Yes Output overcurrent protection Yes Output short circuit protection Yes Output overvoltage protection Yes Input reverse connection protection Yes PV string fault detection Yes DC surge protection Yes AC surge protection Yes Insulation resistance detection Yes Residual current monitoring unit RCMU Yes Display and Communication Technical Specifications SUN2000 5KTL M0 SUN2000 6KTL M0 Display ...

Page 78: ...mmon Parameters Technical Specifications SUN2000 5KTL M0 SUN2000 6KTL M0 Dimensions W x H x D 525 mm x 470 mm x 166 mm Net weight 17 kg with hanging kits without mounting brackets Operating temperature 25 C to 60 C Cooling mode Natural convection Highest operating altitude 0 4000 m derated above 3000 m Relative humidity 0 100 RH Input terminal Amphenol Helios H4 Output terminal Waterproof quick co...

Page 79: ...12 1 C France island power grid 230 V 60 Hz 5 VDE 0126 1 1 BU Bulgaria low voltage power grid 6 VDE 0126 1 1 GR A Greece mainland low voltage power grid 7 VDE 0126 1 1 GR B Greece island low voltage power grid 8 G59 England England 230 V power grid I 16 A 9 G59 Scotland Scotland 240 V power grid I 16 A 10 G83 England England 230 V power grid I 16 A 11 G83 Scotland England 240 V power grid I 16 A 1...

Page 80: ...e power grid 28 IEC61727 60Hz IEC61727 low voltage power grid 60 Hz 29 ANRE Romania low voltage power grid 30 EN50438_IE Ireland low voltage power grid 31 PO12 3 Spain low voltage power grid 32 Egypt ETEC Egypt medium voltage power grid 33 CLC TS50549_IE Ireland low voltage power grid 34 Jordan Transmission Jordan low voltage power grid 35 NAMIBIA Namibia low voltage power grid 36 ABNT NBR 16149 B...

Page 81: ... power grid 53 Chile PMGD Chile PMGD low voltage power grid 54 VDE AR N4120_HV VDE41200 standard low voltage power grid 55 CHINA LV220 380 China low voltage power grid 56 Vietnam Vietnam low voltage power grid 57 TAIPOWER Taiwan low voltage power grid 58 OMAN Oman low voltage power grid 59 KUWAIT Kuwait low voltage power grid 60 BANGLADESH Bangladesh low voltage power grid 61 CHILE_NET_BILLING Chi...

Page 82: ...st power on and change it immediately after login To ensure account security change the password periodically and keep the new password in mind Not changing the initial password may cause password disclosure A password left unchanged for a long period of time may be stolen or cracked If a password is lost devices cannot be accessed In these cases the user is liable for any loss caused to the PV pl...

Page 83: ...ting Dry Contact Scheduling Parameters Issue 03 2019 07 19 Copyright Huawei Technologies Co Ltd 77 Figure B 1 Setting dry contact scheduling parameters End Scenario 2 Multiple Inverters SmartLogger1000A See the SmartLogger1000A User Manual ...

Page 84: ...00000a Use the initial password upon first power on and change it immediately after login To ensure account security change the password periodically and keep the new password in mind Not changing the initial password may cause password disclosure A password left unchanged for a long period of time may be stolen or cracked If a password is lost devices cannot be accessed In these cases the user is...

Page 85: ...SUN2000 5KTL 6KTL M0 User Manual C Setting Export Limitation Parameters Issue 03 2019 07 19 Copyright Huawei Technologies Co Ltd 79 Figure C 1 Setting export limitation parameters ...

Page 86: ...and the SUN2000 is connected to a power meter the output power of the SUN2000 is supplied only to the local load but not the power grid If this parameter is set to Power limited grid connection and the SUN2000 is connected to a Smart power sensor the SUN2000 supplies power limited based on the setting of Grid tied Point Power to the power grid Closed loop controller External controller Inverter Se...

Page 87: ...000a Use the initial password upon first power on and change it immediately after login To ensure account security change the password periodically and keep the new password in mind Not changing the initial password may cause password disclosure A password left unchanged for a long period of time may be stolen or cracked If a password is lost devices cannot be accessed In these cases the user is l...

Page 88: ...oltage Rise Suppression Q U Curve Issue 03 2019 07 19 Copyright Huawei Technologies Co Ltd 82 Figure D 1 Setting voltage rise suppression Q U curveparameters End Scenario 2 Multiple Inverters SmartLogger1000A See the SmartLogger1000A User Manual ...

Page 89: ...login To ensure account security change the password periodically and keep the new password in mind Not changing the initial password may cause password disclosure A password left unchanged for a long period of time may be stolen or cracked If a password is lost devices cannot be accessed In these cases the user is liable for any loss caused to the PV plant Procedure Step 1 On the Home screen choo...

Page 90: ...ssword disclosure A password left unchanged for a long period of time may be stolen or cracked If a password is lost devices cannot be accessed In these cases the user is liable for any loss caused to the PV plant Context The Italy CEI0 21 grid code requires an IPS test for the SUN2000 During the IPS test process the SUN2000 consecutively tests the protection thresholds and time for 10 min overvol...

Page 91: ...e is S2 To start the S2 check you need to set External Signal or Local Command Table F 1 IPS test type description IPS Test Type Description External Signal Setting Local Command Setting S1 The level 1 overfrequency protection threshold is 50 5 Hz and the level 1 underfrequency protection threshold is 49 5 Hz S2 The level 1 overfrequency protection threshold is 51 5 Hz and the level 1 underfrequen...

Page 92: ...frequency protection threshold is 51 5 Hz and the level 1 underfrequency protection threshold is 47 5 Hz S2 The level 1 overfrequency protection threshold is 51 5 Hz and the level 1 underfrequency protection threshold is 47 5 Hz Step 3 Tap Start to start the IPS test After the IPS test is complete IPS State is displayed as IPS state success Tap Reports in the upper right corner of the IPS test scr...

Page 93: ...87 G DRM Configuration Guide for Standard AS NZS4777 2 If Demand Response Modes are required then the installer will need to connect the Huawei SmartLogger1000A Refer to the Huawei document SmartLogger1000A User Manual for Standard AS NZS4777 2 of how to connect the DRED and how to configure the inverter and Smart Logger for use with the DRED ...

Page 94: ...es Co Ltd 88 H Acronyms and Abbreviations A ACDU alternating current distribution unit C CCO central controller H HVRT high voltage ride through L LED light emitting diode LVRT low voltage ride through M MPP maximum power point MPPT maximum power point tracking P PV photovoltaic R RCD residual current device W ...

Page 95: ...SUN2000 5KTL 6KTL M0 User Manual H Acronyms and Abbreviations Issue 03 2019 07 19 Copyright Huawei Technologies Co Ltd 89 WEEE waste electrical and electronic equipment ...

Reviews: