Figure 6-3
Incorrect binding method (1)
Figure 6-4
Incorrect binding method (2)
Step 6
Hoist the RRU onto the tower, as shown in
. Technician B pulls the lifting sling
downwards, and technician C pulls the traction sling outwards to protect the RRU from colliding
with the tower.
RRU3942&RRU3642
Installation Guide
6 Hoisting an RRU and Related Cables onto a Tower
Issue 07 (2013-12-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
43