PDU8000-(0125, 0250, 0400, 0630) DCV8-BXAXXX
BCB Box
User Manual
3 Installation
Issue 01 (2019-03-07)
Copyright © Huawei Technologies Co., Ltd.
9
3
Installation
3.1 Unpacking and Checking
After the BCB box is delivered onsite, unpack the case and check as follows:
Visually inspect the BCB box for shipping damage. If it is damaged, notify the carrier
immediately.
Check that the device bar code is consistent with that in the order. Check that the fittings
comply with the packing list. The rodent-proof mesh and screws are bound to copper
bars. You can find them after you remove the baffle in the BCB box. If some fittings are
missing or do not comply with the packing list, record the information and contact your
local Huawei office immediately.
Screws are tied to copper bars in the BCB box. Therefore, remove the isolation board before taking out
the screws.
3.2 Installation Preparations
3.2.1 Tools
Tool Name, Specifications, and Appearance
Multimeter
Phillips screwdriver
Insulated adjustable wrench
Insulated torque wrench
Combination wrench
Hydraulic pliers