Installation Flow
Precautions
Page 1
Start
Regulation and
Precautions for
Board Handling
Page 2
Tools for
Installation
Page 3
Before You Start
Installing
Subracks
Page 4
to 5
Installing
Boards
Page 6
Setting
Master/Slave
Subracks
Page 7
to 10
Checking the
Battery Jumper
on the SCC
Page
11 to
12
Setting the
Jumpers on the
CRPC
Page
13
Setting the
Jumpers on the
ROP
Page
14
Open
Corrugated Pipe
Page
38
Installing and
Routing
External Fibers
Page
38 to
39
Installing and
Routing Fibers
to a DCM
Frame
Page
40
Installing and
Routing Fibers
Between
Subracks
Page
40
Installing
Subracks and
Boards
Page 4
to 14
Installing
Components
Page
15
Installing and
Routing Cables
Page
16 to
37
Installing and
Routing Fibers
Page
38 to
40
Installing the
Orderwire
Phone
Page
41
Installing the
Digital Video O/E
Conversion
Chassis
Page
42
Checking the
Installation
Page
43 to
44
Setting Up
Optical Paths
Page
45
Engineering
Labels
Page
46 to
47
End
Installing the
DCM Frame
Page
15
Installing the
CRPC/ROP
Frame
Page
15
Cable Holes at
the Top and
Bottom of the
Cabinet
Page
16
Cabinet Power
Cable
Connections
Page
17 to
22
Installing and
Routing Cabinet
Ground and
Power Cables
Page
23 to
26
Installing and
Routing Ground
and Power Cables
to a Subrack
Page
27 to
30
Installing and
Routing Network
Management
Cables
Page
31 to
33
Installing and
Routing Alarm
and Indicator
Cables
Page
34 to
35
Installing and
Routing Clock
Cables
Page
35 to
36
Installing and
Routing Cables to
the CRPC/ROP
Page
37
Installing and
Routing Fibers to a
CRPC Frame
Page
39