4
37
40
60
61
76
81
83
5
35
36
22
21
46
47
62
63
77
3
2
6
7
10
12
14
16
PDU
DCM
DCM
DCM
CRPC
CRPC
5
For safety concern, at least two persons are required to install a subrack. One person is to hold the subrack and
the other person to tighten the panel screws.
Install two CRPC boards and multiple DCM frames to the lower subrack.
1 Installing Subracks (Subracks, Two CRPC Boards and Multiple DCM
Frames)
Installing Subracks and Boards
Structural
component
Installation
holes on one
column
DCM frame
2, 3
4, 5
6, 7
CRPC
10, 12
14, 16
Subrack 1
21, 22, 35, 36
Air deflector
37, 40
Subrack 2
46, 47, 60, 61
Subrack 3
62, 63, 76, 77
TN11PDU
79, 83
DPD63-4-8
PDU
81, 83
OptiX OSN 6800
Subrack 3
OptiX OSN 6800
Subrack 2
OptiX OSN 6800
Subrack 1
Front
NOTE
NOTE
Air deflector