Figure 3-8 Installing a guide rail
3. Install a filler panel for guide rails. Fasten the M6 screws to install the filler
panel for the guide rails.
Figure 3-9 Installing a filler panel for guide rails
4. Install the cage nuts that secure the IVS1800. The cage nut installation
locations are the first and sixth holes along the guide rails, as shown in the
following figure.
IVS1800 Video Management System
User Manual
3 Installing an IVS1800
Issue 02 (2021-01-27)
Copyright © Huawei Technologies Co., Ltd.
13