
FusionModule2000 Smart Modular Data Center
Installation Guide
15 Installing Monitoring Devices
Issue 02 (2018-03-31)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
240
The water detection cable and conversion cable are interconnected through the male and female
connectors.
Step 2
Connect the other end of the conversion cable to the water detector.
Figure 15-83
Connecting the water detector
----End
15.9.4 Routing a Water Detection Cable
Context
Do not contact the water detection cable with metal, for this action will cause a false alarm.
Take protective measures when routing a water detection cable.
Preparations
Materials: water detection cable fastener, water detection cable and accessories
Document: water detection cable routing position diagram
Procedure
Step 1
Plan the installation position for the fastener of the water detection cable. Ensure that the
water detection cable placed on the fastener is in good contact with the floor.
One fastener is provided for a 1 meter long water detection cable.
Step 2
Tear off the protection paper from the rear of the fastener, and then securely attach the
fastener to the floor.