ii
Contents
15 Checking the Cabinet Installation.………………………………….…………………............................………………..51
16 Powering On the System (AC-powered device) …………………….……….............................…………………52
17 Powering On the System (DC-powered ETP4850 power system) …...…....…....…………………53
18 Powering On the System (DC-powered RPS power system) …..... …....…......…………………54
19 Powering On the System (AC-powered Li-ion batteries) …………....................…………………55
20 Powering On the System (DC-powered ETP4860 power Li-ion batteries) ……………56
21 Sealing the Cabinet……………………………………………………………….……….............................…………………57
22 FAQs for Installation……………………………………………………………….……….............................…………………58
23 FAQs for Installation ……………………………………………………………….……….............................…………………59
Appendix A Preprocessing the External Subscriber Cables....................................................................60