Figure D-3 Wrapping cable connectors
Step 5 Install a new fuse board and reconnect the cables.
Figure D-4 Installing the fuse board and cables
Step 6 Reinstall the cover on the fuse board.
Step 7 Reconnect the cables between the UPS and battery packs.
----End
ESS-240V12-(9AhBPVBA04, 7AhBPVBA04) Battery
Pack
Quick Guide
D Replacing a Fuse Board
Issue 01 (2021-12-23) Copyright © Huawei Digital Power Technologies Co., Ltd.
36