
IPE
Installation Guide
6 Installing an Infrared Do me IPC
Issue 03 (2013-02-28)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd
48
Figure 6-4
Installing white expansion particles
Three white expansion particles
Positioning label
A
B
A
B
A
B
Step 5
Remove the lower cover of the IPC. Align the three holes on the lower cover with three
expansion particles installed on the ceiling. Use three 30 mm black self-tapping screws to fix
the lower cover onto the ceiling, as shown in Figure 6-5.
Figure 6-5
Loosening the star screws
Three black self-tapping screws
Positioning label
Top cable outlet
Side cable outlet
A
B
A
B
A
B
Step 6
Route the multi-connector cable, as shown in Figure 6-6.