ACBox2000-21-D-A
User Manual (Pan-Europe Edition)
4 Installation
Issue 01 (2016-12-15)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
18
4.6 Support-Mounted Installation
Procedure
Step 1
Locate the positions for drilling holes based on the ACBox2000 installation dimensions, level
the hole positions using a level, and mark holes using a marker.
Figure 4-7
Marking holes
Step 2
Drill holes using a hammer drill.
Figure 4-8
Drilling holes
Step 3
Insert the delivered bolt assemblies (spring washers, flat washers, and M12x40 bolts) into the
holes, and secure them using stainless steel nuts and flat washers.