System Commissioning
6.1 Checking Before Power-On
Table 6-1
Checking Before Power-On
No.
Check That
Check Result
1
The ACBox2000 is installed reliably in position.
□ Yes □ No
2
All ground cables are connected securely and reliably.
□ Yes □ No
3
All AC input power cables are connected correctly, securely,
and reliably. Phase cables L1, L2, and L3 are connected
correctly.
□ Yes □ No
4
All AC output power cables are connected correctly,
securely, and reliably. Phase cables L1, L2, and L3 are
connected correctly.
□ Yes □ No
5
The insulation partitions and safety warning panels are
installed reliably in position.
□ Yes □ No
6
No foreign matter is left inside the ACBox2000.
□ Yes □ No
7
No insulation layer is damaged and no metal is exposed.
□ Yes □ No
8
All cables are bound neatly, and cable ties are secured
evenly and properly in the same direction.
□ Yes □ No
9
There is no unnecessary adhesive tape or cable ties on
cables.
□ Yes □ No
10
Check that all used waterproof connectors at the chassis
bottom are applied with firestop putty and all locking caps
are tightened.
□ Yes □ No
11
Check that all the locking caps on idle waterproof
connectors at the chassis bottom are tightened.
□ Yes □ No