• The array enclosure installed on the top.
• SFF drive enclosures installed below the array enclosure.
• LFF drive enclosures installed below the SFF drive enclosures.
If you put the array enclosure on top, the numbering will start at the top, which can be more intuitive and
helpful. Having the array enclosure on top also makes the cables fit better in the rack.
Procedure
1.
Slide the enclosure into position on the rails (1). Secure the chassis into the rack by tightening the
captive CTO screw (3) behind the latch on the front left and right bezel ears of the chassis (2).
CAUTION:
The front CTO screw must be attached at all times when racked.
2.
Attach the rear hold down brackets by sliding the tab with the arrow pointed forward (1) into the
corresponding slot on the left and right side of the rear of the chassis. Use the black headed thumb
screw to secure tightly to the rail (2).
24
Install the hardware