background image

TIP: 

The supplied cables are labeled on each end

in the following convention: 

N:S3:P2 -

J1:I2:P1

, where N = Node, S = Slot, P = Port, J

= JBOD, D = Drawer, and I = I/O Module.

Check the labels to determine which cable to use.
The labels are the same on both ends of the cable.

Procedure

StoreOnce 5200:

 Use the supplied HD SAS cables

to connect the node server RAID controller card to
the base storage enclosure.

Cable

Length

From

To

A

2 m

N:S3:P2

J1:I2:P1

B

1 m

N:S3:P1

J1:I1:P1

StoreOnce 5250 and 5650:

 Connect the supplied

SAS cables as shown.

Cable

Length From

To

A

2 m

N:S3:P2

J

F

:D2:IB:P2

F

=1

B

1 m

N:S3:P1

J1:D1:IA:P1

C

0.5 m

J1:D2:IB:P1 J1:D1:IB:P2

D

0.5 m

J1:D2:IA:P1 J1:D1:IA:P2

Connecting the storage enclosure power
cables

Procedure

StoreOnce 5200:

 Connect two power cables to each

enclosure. Connect each power cable to a different
PDU.

StoreOnce 5250 and 5650:

 Connect four power

cables to each enclosure. Connect each power cable
to a different PDU.

Connecting the system cables

Procedure

1.

Connect the power cables.

Connect each power cable to a separate PDU in the
rack.

2.

Connect a network cable to LAN port 1.

3.

Connect a network cable to the iLO port
(recommended).

4.

If you are not using iLO for initial configuration,
connect a VGA monitor and a USB keyboard.

Powering on the system

Prerequisites

All storage enclosures must be installed and cabled
before the system is powered on. For instructions about
installing optional storage enclosures, see the 

HPE

StoreOnce 3620, 3640, 5200, 5250, and 5650 Systems
Installation Guide

.

Page 6     

Summary of Contents for StoreOnce 5200

Page 1: ...d 5650 Systems Installation Guide in the following cases The system includes optional storage products or capacity upgrade kits The system arrived without PCIe cards pre installed or requires addition...

Page 2: ...cumentation for detailed instructions including safety information about installing units within the rack Ensure that you have sufficient personnel or lifting equipment to install the storage enclosur...

Page 3: ...nting the rails 3 Position left and right rack rails at the desired U position in the rack adjusting the rails to fit the rack as needed Front and Rear bottom edge of rails must align with the bottom...

Page 4: ...de and storage enclosure in the rack 5250 and 5650 CAUTION Use extreme caution when installing and pulling units from the rack Units can slip and fall damaging the HPE StoreOnce System or causing pers...

Page 5: ...uts for the server node into the rack one on each front column 7 Install the server node into the rack and secure it using the thumbscrews on the front bezel of the unit Attaching the security bezel P...

Page 6: ...IA P2 Connecting the storage enclosure power cables Procedure StoreOnce 5200 Connect two power cables to each enclosure Connect each power cable to a different PDU StoreOnce 5250 and 5650 Connect four...

Page 7: ..._________________ iLO gateway _____________________________ Configuring the basic network Procedure 1 Log in using the default user name and password Default user name console Default password changem...

Page 8: ...Procedure 1 Navigate to http www hpe com info storeonce docs 2 In Models Subcategories select your product 3 To filter the entries select the types of documents and your language Page 8...

Reviews: