The M.2 SSD/dedicated iLO/serial port enablement board is installed.
• 5 mm hex nut screwdriver is available.
Procedure
1.
2.
Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3.
Disconnect all peripheral cables from the server.
4.
Do one of the following:
• If the server is in tower mode:
Position the tower server for hardware configuration.
• If the server is in rack mode:
Remove the server from the rack.
5.
6.
7.
If installed,
8.
Remove the serial port blank.
9.
Install the serial port.