16. Do one of the following:
• If the server is in tower mode:
Position the tower server for operation.
• If the server is in rack mode:
Install the server on the tray.
17. Connect all peripheral cables to the server.
18. Connect the power cords:
a. Connect each power cord to the server.
b. Connect each power cord to the power source.
The installation is complete.
To configure arrays, see the HPE Smart Array SR Gen10 Configuration Guide at the
Installing an LFF hot-plug drive
CAUTION: To prevent improper cooling and thermal damage, do not operate the server unless all bays are
populated with either a component or a blank.
Procedure
2. Remove the drive blank.
3. Prepare the drive.
52
Hardware options installation