To replace the component:
1. Install the spare system board.
2. Install all components removed from the failed system board.
Be sure to install the DIMMs and persistent memory modules in the same DIMM slots as the failed system board.
3. Install the access panel.
4. Install the power supplies.
5. Power up the server.
6. Review the persistent memory configuration of the server.
For more information, see Configuring the server for Intel Optane persistent memory 100 series for HPE.
7. Do one of the following:
If persistent memory modules are encrypted with local key management, either manually enter the persistent memory module
passwords in the System Utilities or import the password file from the USB key.
If persistent memory modules are encrypted with remote key management, enroll the server iLO in the key management server
to provide access to the data on the persistent memory modules.
For more information, see the Intel Optane persistent memory 100 series for HPE User Guide on the Hewlett Packard Enterprise
website (https://www.hpe.com/info/persistentmemory-docs
https://www.hpe.com/info/persistentmemory-docs).
After you replace the system board, you must re-enter the server serial number and the product ID:
1. During the server startup sequence, press the
key to access UEFI System Utilities.
2. Select System Configuration > BIOS/Platform Configuration (RBSU) > Advanced Options > Advanced System ROM Options > Serial
Number, and then press the
key.
3. Enter the serial number and press the
F9
Enter
Enter
Removing and replacing the system board
173
Summary of Contents for ProLiant DL360
Page 8: ...10 6 Documentation feedback...
Page 9: ...Illustrated parts catalog Illustrated parts catalog 9...
Page 20: ...Processor spare parts Processor spare parts 20...
Page 40: ...Expansion board spare parts Expansion board spare parts 40...
Page 78: ...Customer self repair 78...
Page 79: ...Customer self repair 79...
Page 80: ...Customer self repair 80...
Page 81: ...Customer self repair 81...
Page 82: ...Removal and replacement procedures Removal and replacement procedures 82...
Page 96: ...Removing and replacing the bezel Removing and replacing the bezel 96...
Page 102: ...7 Secure the cables Removing and replacing the ball bearing rails 102...
Page 125: ...Removing the Pensando DSP DSC 25 2p SFP28 card with the iLO Sideband ALOM Module 125...
Page 159: ...guidelines Removing and replacing a persistent memory module 159...
Page 191: ...Troubleshooting Troubleshooting 191...
Page 193: ...Diagnostic tools Diagnostic tools 193...
Page 206: ...Component identification Component identification 206...
Page 236: ...Smart Carrier NVMe SCN drive LED definitions 236...
Page 238: ...HPE Basic Drive LED definitions 238...
Page 241: ...BIOS Platform Configuration RBSU Hot plug fans 241...
Page 248: ...Cabling Cabling 248...
Page 253: ...SFF backplane to P824i p controller 253...
Page 255: ...2 SFF backplane to P816i a controller 2 SFF backplane to P816i a controller 255...
Page 256: ...10 SFF NVMe backplane to NVMe riser 10 SFF NVMe backplane to NVMe riser 256...
Page 257: ...2 SFF NVMe backplane to primary riser 2 SFF NVMe backplane to primary riser 257...
Page 258: ...1 SFF rear backplane to system board SATA 1 SFF rear backplane to system board SATA 258...
Page 259: ...10 SFF backplane to P408i a controller 10 SFF backplane to P408i a controller 259...
Page 263: ...4 LFF backplane to P408i a controller 4 LFF backplane to P408i a controller 263...
Page 265: ...Specifications Specifications 265...
Page 277: ...Support and other resources Support and other resources 277...