NOTE:
If you are installing a Cross Linked (CLM) library, each cabinet must have appropriate
space in front and in back of it, and it must have about 1 inch (2.5 cm) between it and
its adjacent cabinet(s).
Floor clearance
The library has a
fl
oor clearance of 0.75 inch (19 mm). Place the library on a level,
uncarpeted
fl
oor free of defects.
Floor strength and inclination
The
fl
oor at the installation site must be rated at 250 lb/ft
2
(1221 kg/m
2
). This is
suf
fi
cient to support a fully loaded library.
The
fl
oor must be level to within 0.25 inch (6.4 mm) over a 6 ft by 6 ft (1.83 m by
1.83 m) area.
Ventilation
Do not place the library directly over any cooling vents. Placing the library over cooling
vents will result in an “out of temp” reporting in the library log.
Power and grounding
For the United States and Canada, one or two UL/CSA-certi
fi
ed power cords are
supplied with each library. Each power cord uses a 14/3 SJT cord, a L6-20P plug, and
an IEC-C320 C19 female connector (see
1
2
1
Connect to wall outlet plug NEMA L6–20P
2
Connects to library power supply connector IEC-C320 C19
Figure 2 Power supply cord
The library is rated 200-240V~, 50-60Hz.