Setup 34
•
Power cord
•
Hardware documentation, Documentation CD, and software products
•
Rack-mounting hardware
In addition to the supplied items, you may need:
•
T-15 Torx screwdriver
•
Hardware options
•
Operating system or application software
•
PDU
Installing hardware options
Install any hardware options before initializing the server. For options installation information, refer to the
option documentation. For server-specific information, refer to "Hardware options installation (on page
37
)."
Setting up a tower server
Follow the steps in this section to set up a tower model server. If you are going to install the server into a rack,
refer to the rack installation ("
Installing the server into the rack
" on page
35
) section.
1.
Install the feet.
2.
Return the server to an upright position.
3.
Connect peripheral devices to the server ("
Rear panel components
" on page
9
).
WARNING:
To reduce the risk of electric shock, fire, or damage to the equipment, do not plug
telephone or telecommunications connectors into RJ-45 connectors.
4.
Connect the power cord to the rear of the server.
5.
Connect the power cord to the AC power source.
Summary of Contents for PROLIANT ML350 G6
Page 89: ...Hardware options installation 89 c Slide them back and away from the chassis ...
Page 112: ...Troubleshooting 112 ...
Page 137: ...Technical support 137 ...
Page 138: ...Technical support 138 ...